Similar Projects
Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

Archery Park Water Line
Post-Bid
Ogden, UT 84401

Bryner Ploutz Pipeline
Results
$50,000 to $100,000 est. value
Helper, UT 55101

Spanish Fork Ne Irrigation Pipeline
Results
Spanish Fork, UT

3900 South Waterline Improvement Project
Post-Bid
Less than $174,155 est. value
Riverdale, UT 84405

MP15 - 700 South Interceptor Capacity Upgrade and 700 South Water Main
Results
Less than $3,293,600 est. value
Salt Lake City, UT 84115

2550 South Phase 3 Improvement Project
Post-Bid
West Haven, UT 84401

Arnold Springs Improvements Project
Results
Less than $256,561 est. value
Herriman, UT 84096

1200 North Water Line (Old Farm Service Connection) and River Road Water Line Project
Post-Bid
Duchesne, UT 84021

DFCM Construction-DOC AP and P NUCCC Repipe Potable Water Pipes and Sewer Lines
Results
$829,370 est. value
Ogden, UT 84401

West Access Road and Waterline Improvements
Post-Bid
Eagle Mountain, UT 84005

Zone 1W Tank Transmission Main
Results
Bluffdale, UT 84065

Clearfield City 10-Inch Waterline Improvement Project on 1000 East Street
Post-Bid
$176,800 est. value
Clearfield, UT 84015

Construction of the 800 West Improvement Project
Results
West Bountiful, UT 84087

Mountain Dell Outlet Rehabilitation - Control Valves Pre-Purchase
Post-Bid
Salt Lake City, UT 84115

Last Updated 08/18/2021 09:47 AM
Project Title

Construction Of The Beaver Canyon Spring

Physical Address View project details and contacts
City, State (County) Beaver, UT   (Beaver County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,248,755
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of the Beaver Canyon Spring, which includes two schedules and one added alternate; schedule 1 includes development of spring collection area, installation of approximately 5,100 linear feet of fused 6 inch HDPE pipe, spring development, seeding, and related work; schedule 2 includes construction of a new well building, piping, electrical, pump servicing and related work; added alternate includes installation of approximately 4,600 linear feet of fused 12 inch HDPE pipe and related work.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents