Similar Projects
Applied Energy Services Adair County Solar Farm
New Construction, Infrastructure
Conception
$332,000,000 CJ est. value
Kirksville, MO 63501

Patryla Park and Spur Pond Park and Hazel Creek Lake Improvements - City of Kirksville
Infrastructure
Conception
$100,000 CJ est. value
Kirksville, MO 63501

SOFTBALL FIELD ARTIFICIAL PLAYING SURFACE AND FENCING
Infrastructure
Design
$300,000 CJ est. value
Kirksville, MO 63501

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Resurface from Rte 136
Infrastructure
Results
$2,500,000 to $5,000,000 est. value

Resurface from Bus. 63
Infrastructure
Results
$1,000,000 to $2,500,000 est. value

Rotary Park Sidewalk - City of Kirksville
Infrastructure
Conception
$98,000 CJ est. value
Kirksville, MO 63501

Greenwood Interprofessional Autism Center - Phase 2
New Construction, Infrastructure
Post-Bid
$286,309 CJ est. value
Kirksville, MO 63501

2022 Asphalt Construction and Repairs
Term Contract, Infrastructure
Results
MO

Rebuild NE Lift Station - City of Kirksville
Infrastructure
Conception
$400,000 CJ est. value
Kirksville, MO 63501

Construction of New Head Start Building
New Construction, Infrastructure - 3,700 SF
Post-Bid
$800,000 CJ est. value
Kirksville, MO 63501

Grading and Pavement
Infrastructure
Results
$1,000,000 to $2,500,000 est. value
MO

Marion and Jefferson Street Parking Lot - City of Kirksville
Infrastructure
Conception
$269,600 CJ est. value
Kirksville, MO 63501

Forest Lake Trail - Phase II
Renovation
Results
Kirksville, MO 63501

Last Updated 02/20/2023 07:11 AM
Project Title

North Park Trail Phase 1 - City of Kirksville

Physical Address View project details and contacts
City, State (County) Kirksville, MO 63501   (Adair County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2024
Bids Due View project details and contacts
Estimated Value $487,828 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined This project is in included in the City of Kirksville FY 2023-2027 Capital Improvement Plan (CIP). As of February 20, 2023, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents