Similar Projects
Provide and Replace Inverter and Protection Batteries at Lake Hodges Pumped Storage and Hydroelectric Facility
Alteration
Design
$200,000 est. value
San Diego, CA 92101

Fallbrook High School Cafeteria Electrical Upgrades
Renovation
Sub-Bidding
$200,000 CJ est. value
Fallbrook, CA 92028

FY 23-24 Rectangular Rapid Flashing Beacons And L.E.D. Stop Signs
Infrastructure
Sub-Bidding
$655,000 CJ est. value
Oceanside, CA 92054

Replace Primary Substation, Transformer and Dual Primary Selective Switches
Renovation
Post-Bid
$20,000,000 CJ est. value
San Diego, CA 92161

Citywide Street Lights Groups 1701 and 1702
Infrastructure
Post-Bid
$810,245 CJ est. value
San Diego, CA 92101

Kensington Heights 2 Series Circuit Upgrade
Infrastructure
Results
$1,630,000 est. value
San Diego, CA 92116

Installation of Lead Pedestrian Interval Traffic Signal Operations
Infrastructure
Results
$1,345,924 CJ est. value
Chula Vista, CA 91910

Intercom Ip Speaker Installation (Phase 1)
Renovation
Sub-Bidding
$300,000 CJ est. value
Vista, CA 92083

Nierenberg Switchgear Replacement
Alteration
Post-Bid
$616,000 est. value
San Diego, CA 92037

Job Order Contract - Fire Protection and Electrical Contractor
Term Contract
Results
San Diego, CA

Radar Feedback Signs (RFS) at Various Locations: Douglas Dr., Mesa Dr., El Camino Real, and Vista Way
Infrastructure
Sub-Bidding
$90,000 CJ est. value
Oceanside, CA 92054

On-Call Low Voltage and Fiber Optic Installation and Repair Services
Term Contract
Post-Bid
San Diego, CA 92101

Preventative Maintenance Service on the Battery System and UPS System
Alteration
Results
$388,000 est. value
San Diego, CA

As-Needed Energy Consulting Services
Term Contract
Post-Bid
$3,000,000 est. value
San Diego, CA

Mandell Weiss Theater Switchgear
Alteration
Results
$1,030,000 est. value
San Diego, CA 92093

Last Updated 10/10/2023 04:54 PM
Project Title

Traffic Signal Upgrade at Five Locations

Physical Address View project details and contacts
City, State (County) San Diego, CA 92101   (San Diego County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $1,260,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of 9/7/2023, this project has been cancelled. No additional information is available at this time. Construction consists of modifications to existing traffic signals at the intersections of Jackson Drive and Navajo Road, Ash Street at 1st Avenue, 4th Avenue and 5th Avenue. Construction also consists of installation of a new traffic signal at the intersection of 47th Street and Solola Avenue, the work will include, but not limited to, the installation of new traffic signal poles, mast arms, vehicle and pedestrian indications, audible pedestrian countdown type signals, traffic signal controller and cabinet, traffic signal meter, curb ramps vehicle detectors, pedestrian push buttons, EVPE and traffic signs and striping. License Requirements C-10 The Director (or Designee) of the Purchasing & Contracting Department is the officer responsible for opening, examining, and evaluating the competitive Bids submitted to the City for the acquisition, construction and completion of any public improvement except when otherwise set forth in these documents. Any questions related to this solicitation shall be submitted to: RRiego@sandiego.gov 9.2. Questions received less than 14 days prior to the date for opening of Bids may not be considered. SAP NO. (WBS/IO/CC): B-14048, B-18069, B-20141

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents