Similar Projects
Sunrise Mall Macy's Redevelopment Phase 2
New Construction
Conception
Citrus Heights, CA 95610

Sunrise Mall Redevelopment Phase 3
New Construction
Conception
Citrus Heights, CA 95610

Sunrise Mall Sears Redevelopment Phase 1
New Construction
Design
Citrus Heights, CA 95610

Aggie Square at UC Davis - Phase 1
New Construction
Design
Sacramento, CA 95817

Olive Garden #6466 Conversion
Renovation - 7,476 SF
Post-Bid
Sacramento, CA 95834

Chevy`s Fresh Mex
Renovation - 11,372 SF
Post-Bid
Sacramento, CA 95833

9362 Studio Court Remodel - Phase 2 Tenant Improvements
Renovation
Results
$5,706,000 est. value
Elk Grove, CA 95758

Raising Cane's #570
New Construction - 3,579 SF
Construction
$500,000 to $1,000,000 CJ est. value
Elk Grove, CA 95624

Mid-Rise Multifamily Community
New Construction - 10,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Sacramento, CA

Q Street Development
New Construction, Demolition - 27,200 SF
Pending Verification
$10,000,000 est. value
Sacramento, CA 95811

Sunrise Mall JC Penney & Macy's Women Redevelopment Phase 4
New Construction
Conception
Citrus Heights, CA 95610

1330 N Street Mixed-Use Development
New Construction - 100,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Sacramento, CA 95814

Holiday Inn Apartment Conversion
Renovation, Demolition
Pending Verification
$3,000,000 est. value
Sacramento, CA 95814

Theory Sacramento Apartments
New Construction
Conception
Sacramento, CA 95819

Hornet Commons at California State University Sacramento
New Construction
Design
$150,000,000 est. value
Sacramento, CA 95811

Last Updated 03/16/2022 04:53 PM
Project Title

2701 Broadway

Physical Address View project details and contacts
City, State (County) Sacramento, CA 95818   (Sacramento County)
Category(s) Commercial, Residential
Sub-Category(s) Apartments/Condominiums, Food/Beverage Service
Contracting Method Bids by Invitation.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $4,320,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

37,350 SF - Apartments/Condominiums, 5 Stories Above Grade, New Construction, 31 Unit(s), Food/Beverage Service, 1 Story Above Grade, 1,150 SF Demolition, 37,350 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Acoustical Ceilings, Resilient Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 14 - Conveying Equipment, Elevators, Elevator Equipment and Controls, Elevator Controls, Elevator Equipment, Elevator Safety Equipment, Elevator Hoistway Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents