Similar Projects
Murphy USA #7200 / Eastman
New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Eastman, GA 31023

SR 165 From SR 132 to S of SR 30
Infrastructure
Design
$2,000,000 CJ est. value
Eastman, GA 31023

SR 165 From SR 132 to S of SR 30
Infrastructure
Design
$2,000,000 CJ est. value
Eastman, GA 31023

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

Fiscal Year 2021 LMIG Projects
Results
Eastman, GA

Fiscal Year 2021 Dodge County T-Splost Part 1
Infrastructure
Results
GA

Jacks / Eastman
New Construction, Infrastructure - 3,275 SF
Post-Bid
$1,000,000 CJ est. value
Eastman, GA 31023

Water System Improvements
Infrastructure
Results
Chester, GA

2020-2022 LMIG, Street Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
Eastman, GA 31023

Fiscal Year 2021 Dodge County T-Splost Part 2
Infrastructure
Results
GA

2020-2022 LMIG Street Improvements
Infrastructure
Post-Bid
$220,000 CJ est. value
Eastman, GA 31023

Dodge State Prison Drainage Improvements Phase 2
Infrastructure
Results
Chester, GA 31012

Fiscal Year 2022 LMIG Projects
Infrastructure
Results
GA

Repaving at Middle School
Infrastructure
Results
Eastman, GA 31023

Last Updated 03/30/2023 11:28 AM
Project Title

Runway 2/20, Apron, and Stub Taxiway Rehabilitation at Heart of Georgia Regional Airport

Physical Address View project details and contacts
City, State (County) Eastman, GA 31023   (Dodge County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $3,200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July , 2022, this project has not yet been awarded. A timeline for award has not yet been established.** The approximate extent and character of the Work for the Runway 2/20, Apron, and Stub Taxiway Rehabilitation Project is generally described as follows: This project includes the rehabilitation of Runway 2/20 (approximately 6506'X100') Apron, and Stub Taxiway at the Heart of Georgia Regional Airport. Rehabilitation includes milling, hot mix asphalt, crack sealing, pavement markings grooving, and drainage improvements. Bidders shall inform themselves concerning Georgia Laws and comply with same. If awarded, the time allowed for Substantial Completion on Runway 2/20, Apron, and Stub Taxiway Rehabilitation is Sixty (180) consecutive calendar days from the date of Notice to Proceed for Construction. Each Bid must be accompanied by a Bid Bond with good and sufficient surety or sureties approved by the owner for faithful acceptance of the contract, payable to, in favor of, and for the protection of the OWNER in an amount equivalent to five percent (5%) of the total amount payable by the terms of the contract or, in lieu thereof, in the form of a certified check, cashier's check, or cash in equal amount. The Successful Bidder will be required to furnish performance and payment bonds with the executed Agreement meeting the requirements of the Contract Documents and executed on the forms attached to the Agreement. The terms and time for payment are set forth in the Agreement. Surety and insurance companies must have an AM Best rating of A-6 or greater, be listed in the Federal Registry of Companies holding Certificates of Authority and Acceptable Sureties on Federal Bonds, be licensed by the Georgia Insurance Department and the Georgia Secretary of State to do business in the State of Georgia. Questions regarding website registration, online orders or electronic bidding, please contact Plan House Printing at (228) 248-0181. No bid may be withdrawn by the bidder within one hundred twenty (120) days after actual date of bid opening. This project is funded under provision of the Airport and Airway Safety and Capacity Act of 1987. The award of this contract is contingent upon the availability of Federal funding. Certain mandatory federal requirements also apply to this solicitation and will be made a part of any contract awarded. (a) Davis Bacon Act (DOL Regulation 29 CFR Part 5) (b) Affirmative Action to Ensure Equal Employment Opportunity (Executive order 11246 and DOL Regulation 41 CFR Part 60) (c) Copeland Act, 29 CFR Part 3 and 5. (d) Contract Work Hours and Safety Standards Act. (e) Title VI of Civil Rights Act of 1964. (f) Disadvantaged Business Enterprises participation 49 CFR Part 26.13. The DBE participation goal is 24.6%. (g) Government wide Debarment and Suspension and Government wide Requirements for Drug-free Workplace (DOT Regulation 49 CFR Part 32) (h) Buy American Preferences (Title 49 United States Code, Chapter 50101) (i) Foreign Trade Restriction: Denial of Public Works Contracts to Suppliers for Goods and Services of Countries that Deny Contracts to Suppliers of Goods and Services of Countries that Deny Procurement Market Access to U.S. Contractors (DOT Regulation 31 CFR 1352) (j) Goals for Minority and Female Participation (41 CFR Part 60-4.2) (k) Certification of Nonsegregated Facilities (41 CFR Part 60-1.8) (l) Debarment, Suspension, Ineligibility and Voluntary Exclusion (2 CFR part 180 (Subpart C) (m) Bid guarantee of 5% (49 CFR Part 18.36(h)(1)) (n) Performance Bond of 100% (49 CFR Part 18.36(h)(2) (o) Payment Bond of 110% (49 CFR Part 18.36(h)(3)) By submitting a bid/proposal under this solicitation, except for those items listed by the offeror on a separate and clearly identified attachment to this bid/proposal, the offeror certifies that steel and each manufactured product, is produced in the United States (as defined in the clause Buy American - Steel and Manufactured Products For Construction Contracts) and that components of unknown origin are considered to have been produced or manufactured outside the United States. The HGRAA reserves the right to waive any informalities or irregularities in the bids received and to reject any or all bids or to award or refrain from awarding the contract for the work, whichever is deemed to be in the Owner's best interests. The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Value Range is $3,000,000 - $3,200,000

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents