Similar Projects
Football Stadium Parking Expansion
Infrastructure
Conception
$4,700,000 est. value
Paradise, CA 95969

2025 Road Rehabilitation - 50494 - City of Chico
Infrastructure
Conception
$2,700,000 est. value
Chico, CA 95928

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

Gold Flat Campground Upgrades
Renovation
Results
$700,000 to $1,100,000 est. value
Oroville, CA 95966

Place Hot Mix Asphalt (Type A) and Replace AC Surfacing
Infrastructure
Results
$1,500,000 est. value
Forest Ranch, CA 95942

2027 Road Rehabilitation - 50560 - City of Chico
Infrastructure
Conception
Chico, CA

On-System Roadway Rehabilitation Skyway
Infrastructure
Post-Bid
$6,790,000 est. value
Paradise, CA

Bell Avenue Complete Street Rehabilitation Project
Infrastructure
Results
$4,163,870 est. value

State Route 32 Widening Phase 3 - 50475 - City of Chico
Infrastructure
Conception
$816,353 est. value
Chico, CA 95928

Berry Brush Stewardship IRSC (Fire Salvage) (rebid)
Infrastructure
Post-Bid
CA

2022 Road Rehabilitation
Infrastructure
Results
$600,000 est. value
Chico, CA

2023 Road Rehabilitation - 50492 - City of Chico
Alteration
Conception
Less than $2,650,000 est. value
Chico, CA 95928

Road Rehabilitation Project
Infrastructure
Results
$3,500,000 est. value
Paradise, CA 95967

Last Updated 06/16/2022 09:36 AM
Project Title

Floral-Eaton Roundabout - 50472 - City of Chico

Physical Address View project details and contacts
City, State (County) Chico, CA 95973   (Butte County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Site Development
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $3,317,389
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Chico, California. Conceptual plans call for site work for a road / highway; and for paving for a road / highway. Installation of a 4-lane roundabout at the intersection of Floral Avenue and Eaton Road. The project is included in the City of Chico's FY 2021-2032 Capital Improvement Program (CIP). As of June 15, 2022, information regarding a design team or a general contractor is not available. Funding is anticipated in 2022-2023.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents