Similar Projects
RFP Design - Building Construction, Water and Wastewater Plan Review Services
New Construction, Infrastructure
Bidding
$450,000 CJ est. value
Goodyear, AZ 85338

RFP - Building Inspector Services to Tuba City Regional Health Care Corporation (TCRHCC)
Term Contract
Bidding
$622,000 CJ est. value
Tuba City, AZ 86045

2021-2022 Contract Services Annual Notice and Instructions
Infrastructure
Post-Bid
Phoenix, AZ

A-E IDIQ Surveying and Mapping
New Construction, Term Contract
Post-Bid
$10,000,000 est. value

Multimedia Environmental Compliance Engineering Support for Navy, Marine Corps, and other DOD Installations, and Federal Agencies
Results
Norfolk, VA

Multimedia Environmental Compliance Engineering Support for Navy, Marine Corps, and other DOD Installations, and Federal Agencies
Results
Norfolk, VA

RFP - On-Call Professional Design Services Water and Wastewater Treatment
Term Contract
Bidding
Glendale, AZ 85301

Professional Design Services for Fire Station No 3
New Construction
Post-Bid
$5,800,000 est. value
Tucson, AZ 85719

Community Center Expansion Project
New Construction, Alteration
Results
Somerton, AZ

RFP Engineering - Hualapai Power Line and Substation Design and Engineering
New Construction, Infrastructure
Bidding
$1,881,135 CJ est. value
Peach Springs, AZ 86434

Construction Management at Risk Services for the Construction of the Community Center and Aquatic Facility
New Construction, Infrastructure - 55,000 SF
Post-Bid
$47,000,000 CJ est. value
Marana, AZ 85653

Downtown Campus Modernization Project Architectural and Construction Administration Services
New Construction
Results
$65,000,000 est. value
Glendale, AZ 85301

RFQ - Emergency Shelter / Heat Related Respite Operator and Supportive Services
Term Contract
Bidding
Phoenix, AZ 85004

Architectiral and Engineering Design Services for the Greyhills Academy High School
Renovation, Infrastructure
Post-Bid
$1,000,000 est. value
Tuba City, AZ 86045

RFQ - Project Manager Services to Tuba City Regional Health Care
Term Contract
Bidding
Tuba City, AZ 86045

Last Updated 01/04/2024 01:46 PM
Project Title

RFP Design - Roof Repair And Structural Stabilization Of The Osterman Gas Station On The Hualapai Reservation

Physical Address View project details and contacts
City, State (County) Peach Springs, AZ 86434   (Mohave County)
Category(s) Professional Services
Sub-Category(s) Architectural
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected April 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Hualapai Planning Department is soliciting the services of an architect and design team (A&E) to first analyze the Osterman's Gas Station building's structural integrity and then provide design services including but not limited to schematic, design development and construction documents for repair of the roof and wall stabilization. Coordination with Mohave County Development Services Department will also be required. The A&E firm shall also provide a cost estimate and proposed schedule for the project and contract administration (CA) services throughout the construction phase. All proposals submitted in response to this RFP must conform to the requirements and specifications outlined in this document in its entirety. Contract Time Period (Approx.) Design October 15, 2022 to December 31, 2022 Contract Time Period (Approx.) Construction April 1, 2023 to August 31, 2023 The method of Contractor Selection has not been Determined at this time.

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents