Similar Projects
661-667 Howard Street
New Construction, Demolition
Conception
San Francisco, CA 94105

2929 Broadway Mixed-Use Development
New Construction, Demolition - 222,820 SF
Conception
$10,000,000 CJ est. value
Oakland, CA

Updating Ground Air Systems at Eastern Maintenance Facility (EMF) and Central Maintenance Facility (CMF) Facilities
Renovation
Bidding
$250,000 est. value
Los Angeles, CA 90065

Qualified Contractors List for 2022 Calendar Year
Renovation
Bidding
San Fernando, CA

Construction Mac; Pacnorwest
New Construction, Renovation
Post-Bid
$100,000 to $3,500,000 est. value

Construction Mac; Pacnorwest
New Construction, Renovation
Post-Bid
$100,000 to $3,500,000 est. value

El Centro Maintenance Building Improvements Project
Renovation
Results
El Centro, CA 92244

Bus Hydrogen Refueling Station Consulting And Project Management Services
Renovation
Results
Santa Clarita, CA 91355

Studio 2000
New Construction, Demolition - 43,567 SF
Construction
$10,000,000 est. value
Berkeley, CA 94704

Construction Manager - On-Call Professional Services for CM and Inspection of Capital and Development Projects
New Construction
Bidding
Desert Hot Springs, CA

Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for New Construction, Renovation, and Repair of General Building Construction at Various Government Installations
New Construction, Renovation
Post-Bid

California State Library Elevator Moderization
Renovation
Results
$1,533,000 est. value
Sacramento, CA 95814

Construction Management Services
New Construction
Bidding
Manteca, CA

As Needed Services for Facilities or Building Maintenance
Term Contract
Post-Bid
Pleasanton, CA

Ranger Office Renovation at Stevens Creek County Park
Renovation
Results
$277,000 est. value
Cupertino, CA 95014

Reported 06/29/2022 10:24 AM
Project Title

FY2022-23 Data Center Environmental System and Passport Center HVAC Replacement - 500277 - City of Roseville

Physical Address View project details and contacts
City, State (County) Roseville, CA 95678   (Placer County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected August 2022, Construction Completion Expected June 2023
Bids Due View project details and contacts
Estimated Value $460,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of a municipal facility in Roseville, California. Conceptual plans call for the renovation of a municipal facility. This project provides funds to replace the three cooling units of the environmental system for the City's main data center located at 316 Vernon Street. The units are at the end of their life cycle and need to be replaced to ensure reliability. The estimated cost to replace these units is $402,500. Additionally, the HVAC split system for the lobby of the Passport Center has been unreliable, and parts have been difficult to acquire. This project will replace the existing unit with a more common and reliable one as per recommendations from a mechanical engineer. The cost of the new unit is $57,500. Project is included in the City of Roseville's FY 2022-2027 Budget CIP. As of June 28, 2022, information regarding a design team or a general contractor is not available. Funding is anticipated in FY 2022-2023.* A firm timeline for construction has not been determined, however construction is anticipated to be completed on June 30, 2023.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Misc. Buildings, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents