Similar Projects
2021 Street Repair Program Phase 1
Post-Bid
$655,000 est. value
Middleburg Heights, OH 44130

Sunset Drive Area – Utility Improvements
Results
$350,000 est. value
Bay Village, OH

Jennings and Old Denison Combined Sewer Cleaning 2019
Results
Less than $1,200,000 est. value
Cleveland, OH 44115

Design Build Net Zero Cool Project
Results
Cleveland, OH 44114

Debris Racks and Access Road Improvements in Various Locations Design/Build
Results
$285,687 est. value
Cleveland, OH 44115

CSO Outfall Repairs and Improvements
Results
Less than $2,900,000 est. value
Cleveland, OH 44115

East 42 nd Street Sewer Separation
Results
Less than $703,608 est. value
Newburgh Heights, OH 44105

2020 Sewer Rehabilitation Program
Term Contract
Results
Less than $3,500,000 est. value
Cleveland, OH 44115

Sewer Test Tee Inspection, Installing and Snaking
Term Contract
Results
Cleveland, OH 44114

Annual Sanitary and Storm System Repair Program
Term Contract
Results
Solon, OH 44139

CSO Floatables Control Sites Maintenance 2020-2023
Term Contract
Results
Less than $670,000 est. value
Cleveland, OH 44115

Whitewood Road Aerial Sewer and Storm Sewer Improvements
Results
Brecksville, OH 44141

Miscellaneous CSO Improvements
Results
Less than $2,150,000 est. value
Cleveland, OH 44115

Hydrovac and Jetting Services
Term Contract
Results
$250,000 est. value
Cleveland, OH 44115

W. 3rd Quigley/Westerly Miscellaneous CSO Control
Results
Less than $12,100,000 est. value
Cleveland, OH 44115

Last Updated 02/26/2020 08:48 AM
Project Title

Doan Valley Regulators/Relief Sewers

Physical Address View project details and contacts
City, State (County) Cleveland, OH 44115   (Cuyahoga County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

combined sewer overflow (CSO) control project for the Easterly service area that is part of NEORSD`s Consent Decree, Control Measure No. 8, for the Doan Valley Tunnel System. In general, the work shall consist of furnishing all labor, materials, equipment, and incidentals for construction of the following work: Modify, abandon, and/or reconstruct fourteen (14) existing regulators, flow dividers, and/or manholes: DV-08, DV-08A, DV-19, DV-20, DV-21A, DV-22, DV-22A, DV-23, DV-26, DV-54, DV-56, DV-59, E-44, and MH DVG4A10A20. Construct one (1) new regulator: DV-22B. Construct approximately 509 LF of open cut pipe and associated manholes and appurtenances, categorized by nearest regulator: o DV-19: 7-LF of 24-IN Pipe (DV-19) and one (1) associated manhole o DV-22B: 62-LF of 18-IN Pipe and one (1) associated manhole o DV-57 (Mapleside Road & Notre Dame Ave): 20-LF of 21-IN Pipe, 404 LF of 30-IN Pipe, and five (5) associated manholes o DV-59: 8-LF of 12-IN Pipe and one (1) associated manhole Rehabilitate approximately 2,030 LF of existing 12", 15", 18", 20", 21", 30", and No. 5 egg sewers using cured-in-place (CIPP) lining. Relocate, support, monitor, and protect utilities, including two (2) small diameter water line utility relocations.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents