Similar Projects
Last Updated | 01/07/2022 02:25 AM |
Project Title | Overlay (Spring, Fy 2021-2022) |
Physical Address | View project details and contacts |
City, State (County) | Prescott, AZ (Yavapai County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $624,338 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The scope of work includes furnishing of all labor, materials, equipment, fixtures and services required for a 2" fiber reinforced asphaltic concrete overlay on Coleman Drive, Cannon Drive, Bullard Drive, Bullard Circle, and Paso Drive in Congress; and a 2" fiber reinforced asphaltic concrete overlay on Tabletop Way and West Way in Yarnell. The total project length is 11,555 feet with approximately 3,665 tons of fiber reinforced asphaltic concrete with PG 70-10 binder. Other associated work includes adjusting three water valve box frames, 5,420 linear feet of thickened edge preparation, re-establishing two ADOT-type BB Retroreflective Pavement Markings and pavement markings on Tabletop Way. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |