Similar Projects
Last Updated | 01/12/2023 03:08 AM |
Project Title | Repair Saint Peter Regional Treatment Center Glueck Pond Outlet Control - Rebid |
Physical Address | View project details and contacts |
City, State (County) | Saint Peter, MN 56082 (Nicollet County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Shoreline/Erosion/Drainage, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $82,252 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Site Directions: Saint Peter Regional Treatment Center 100 Freeman Drive, Saint Peter, MN 56082 The work will be done under one prime contract that includes: General construction. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Furnish and Install Silt Fence 2. Remove Glueck Pond Outlet Control Structure 3. Install Outlet Control Structure consisting of 72" Diameter Aluminized Steel Liner Plate, 36" x 24" Prefabricated Aluminized Steel Riser, Connect to Existing 24" CMP, and Concrete 4. Cured In Place Pipe-Line of 24" Corrugated Metal Pipe 5. Install Existing Grate and Baffle on Outlet Control Structure 6. Install Rip Rap Stabilization at Pond Outlet Pipe Est. Completion Date: June 2, 2023 All questions should be submitted no later than December 2, 2022 to Katy McCann at katy.mccann@state.mn.us. The State is not obligated to answer questions submitted after the question due date and time. This solicitation includes qualification requirements. Attachment C of the Response Form contains the qualification requirements for the solicitation. Qualification requirements include, but are not limited to: Responding company has completed as a Prime Contractor or as a Subcontractor, the work for at least 2 contracts which have achieved Substantial Completion since November 2019 for construction of stormwater detention pond outlets and outlet pipe stabilization. Each of these contracts MUST have had a construction value of $30,000 or greater. To view the Attachment C Qualification Form where the information above is located, as well as additional qualification requirements, go to the VirtuBid area of the Quest CDN plan room for this project and download the Response Form. All applicable attachments in the Response Form must be completed and uploaded before a bid can be posted in the Portal. |
||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |