Similar Projects
Barclay Avenue Multilaning - 100380 - Hernando County
Infrastructure
Conception
$17,584,082 CJ est. value
Spring Hill, FL 34609

Coastal Way Intersection - 105900 - County of Hernando
Infrastructure
Conception
$650,000 CJ est. value
Brooksville, FL 34613

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

U-Haul Moving & Storage of Brooksville
Addition, Infrastructure - 117,712 SF
Design
$13,000,000 CJ est. value
Brooksville, FL 34601

Bayou Drive Restoration Stabilization Shoulder Repair
Infrastructure
Post-Bid
$200,000 CJ est. value
Bayport, FL 34607

Peck Sink Trail and Overlook Project
Infrastructure
Post-Bid
$527,300 CJ est. value
Brooksville, FL 34601

Winding Waters K8 New Parent Drop Off
Infrastructure
Results
$1,606,900 CJ est. value
Brooksville, FL 34614

W Landover Blvd from Northcliffe Blvd to Elgin Blvd Sidewalk - Lap
Infrastructure
Results
$989,726 CJ est. value
Brooksville, FL 34601

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Livano at Nature Coast
New Construction, Infrastructure
Construction
$131,300,000 CJ est. value
Spring Hill, FL 34608

Kettering Road Industrial Development
New Construction, Infrastructure - 2,400,000 SF
Pending Verification
$1,000,000,000 CJ est. value
Brooksville, FL 34602

Milkaway Farms
New Construction, Infrastructure - 50,000 SF
Pending Verification
$400,000,000 CJ est. value
Brooksville, FL 34601

South Brooksville BMP-2 Drainage Improvement - 106220 - County of Hernando
Infrastructure
Conception
$1,000,000 CJ est. value
Brooksville, FL 34601

FAMU(Florida A and M University) International Goat Research Facility Project
Renovation, Infrastructure
Post-Bid
Brooksville, FL 34601

Reconstruction and Paving of Royal Highlands & Ridge Manor Roads
Infrastructure
Results
$4,014,755 CJ est. value
Brooksville, FL 34601

Last Updated 09/18/2023 03:03 PM
Project Title

PACE Hernando

Physical Address View project details and contacts
City, State (County) Spring Hill, FL 34608   (Hernando County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Site Development, Vocational School
Contracting Method Bids by Invitation
Project Status Contract Award, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Question Deadline 07/07/2023 at 5:00 PM ET The facility will serve as a year-round alternative school with wrap-around social services for girls ages 11-17 (the "Day Program"), as well as provide office space for therapists and counselors who meet with girls both on site and off site to offer emotional, behavioral health, and support services.

Details

12,265 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents