Similar Projects
A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

2020 Architect and Engineering IDIQ
Post-Bid
$5,000 to $75,000,000 est. value

Various Phase II Projects
Post-Bid
$300,000 to $3,000,000 est. value

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

Various Phase III Construction Inspection Projects
Post-Bid

National Architecture/Engineering/Interiors (IDIQ) Contract
Results
Less than $25,000,000 est. value

Various Phase I Studies
Post-Bid
Less than $20,000,000 est. value

Florida Windspeed UFC Update
Results

Various Phase I Traffic Studies Projects
Post-Bid
Less than $800,000 est. value

Crack and Joint Sealing of PCC Pavement
Results
Naperville, Plainfield, IL 60544

Various Phase II Subsurface Utility Engineering Projects
Post-Bid
Less than $4,000,000 est. value

Bituminous Surface
Results
Darien, IL 60561

Phase III Various Quality Assurance Testing
Post-Bid
Less than $1,000,000 est. value

Various Statewide Engineering for Structure Projects, Major River Bridge Inspections, Bureau of Bridges and Structures
Results
Less than $2,000,000 est. value

Reported 04/15/2022 12:00 AM
Project Title

Phase II Design Engineering Services for County Farm Road Multi-Use Path Improvements

Physical Address View project details and contacts
City, State (County) Hanover Park, IL 60133   (DuPage County)
Category(s) Heavy and Highway, Professional Services
Sub-Category(s) Engineering, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Seeking qualified firms for Phase II design engineering for the County Farm Road Multi-Use Path Improvements on County Farm Rd from Greenbrook Blvd (just east of County Farm Rd) to the Metra Station. An existing HMA multi-use path exists along the north side of Greenbrook Blvd. from Lake Street to the entrance of the Aquatic Center, approximately 850’ east of County Farm Road. The Village would like to extend this trail along the north side of Greenbrook Blvd, to County Farm Road, and then north along County Farm Road and Church Road to the Hanover Park Metra Station.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents