Similar Projects
Thumb Correctional Facility - Franklin - Electrical Modifications
Bidding
Lapeer, MI 48446

Generator Waste Water Plant
Bidding
New Baltimore, MI

Electrical Contractor Services
Term Contract
Post-Bid
Detroit, MI 48226

Renewable Energy Systems Pilot Program
Post-Bid
Alanson, MI

Infrastructure Upgrade - Switch Replacement Project
Results
Monroe, MI

City of Grand Haven Neighborhood Housing Services
Results
Grand Haven, MI

600KVA Generator
Bidding
Novi, MI 48377

LED Lighting Conversion Project
Post-Bid
Clarkston, MI 48346

Sylvester Power Improvements
Results
Less than $56,500 est. value
Berrien Springs, MI

E-One Grinder Pumps
Bidding
Oakland, MI

Building Generator Maintenance
Term Contract
Post-Bid
Brighton, MI 48116

Removal and Installation of a New Substation Transformer
Results
Wyoming, MI

COA Tustin Kitchen/Meal Site Emergency Standby Generator
Bidding
$30,000 est. value
Reed City, MI

Pearl Sub Transformer 3 Control Building and Relay Panels
Post-Bid
Marshall, MI

2019 LED Retrofit Materials
Results
Less than $8,820 est. value
Richmond, MI

Reported 12/24/2020 12:00 AM
Project Title

Combined Heating and Power Plant Turbine/Generator Overhaul

Physical Address View project details and contacts
City, State (County) Battle Creek, MI 49037   (Calhoun County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This Statement of Work describes the service necessary to overhaul the Steam Turbine located at 5500 Armstrong Road, Battle Creek, Michigan, Combined Heating and Power (CHP) plant. Equipment consists of a complete Engineered Turbine Generator skid (attached). This includes a Coppus Model RLHA-24 steam turbine, a Murray model K steam turbine, a Lufkin Gear model N1400C gearbox, and an Ideal Generator model SAB 2200 kW generator with Ewing Controls. Contractor will provide Craft labor support with supervision, tooling/specialty tooling, forklift, air compressor, on-site glassbead/sandblast and other miscellaneous special tooling/handling equipment. Turbine/generator inspection and overhaul. This includes, but not limited to: Base Scope: Packaged Steam Turbine and Generator Outage • Borescope the LP • Pull cover on the HP to inspect turbine rotor and replace carbon seals • Inspect bearings. HP(2) HP thrust(1) LP(2) thrust(1) Gearbox(4) thrust(1) Generator(2) • Inspect HP trip valve • Inspect HP control valve • Inspect gear box. Perform a gear contact check • Pull generator end shields and check end windings and rotor in place • Electrical checks on generator rotor, stator and exciter. • Open and inspect HP non-return valve. Paper check on disk to seat. Lift check for bushing clearances. • PM checks on Woodward governor and start up support • Stator testing. Power Factor, Megger, Winding Resistance • Rotor testing. Megger, Winding Resistance • Brush-less Exciter. Megger, visual inspection • Generator Breaker. Maintenance cleaning & Inspection, Megger, Contact Resistance, • Test integrity of Hi-pot Vacuum Bottles. • Generator Cables to the breaker. Megger • Generator Protection Relay. Test the programed functions and verify if trip power is available. • Renew lubricating oil • Drain water and dirt from reservoir/ bearing housing; top off oil as needed • Check instrument air & lube oil filters; replace as needed Provide a completed report with overhaul findings/corrections/recommendations. QUALIFICATOINS The contractor shall provide certification and/or experience with Turbine/Generator inspecting and testing of a Coppus Model RLHA-24 steam turbine, a Murray model K steam turbine, a Lufkin Gear model N1400C gearbox, and an Ideal Generator model SAB 2200 kW generator with Ewing Controls. The contractor will provide Craft labor support with supervision, tooling/specialty tooling, forklift, air compressor, on-site glassbead/sandblast and other miscellaneous special tooling/handling equipment. The contractor shall provide certification and/or experience of mechanical maintenance which will include tooling and supervision. The contractor shall provide certification and/or experience of Turbine/Generator Control knowledge, calibration, and testing for the turbine/generator system identified in 4.a.

Details

Division 01 - General Requirements, Quality Control, Testing and Inspecting Services.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents