Reported | 12/24/2020 12:00 AM |
Project Title | Combined Heating and Power Plant Turbine/Generator Overhaul |
Physical Address | View project details and contacts |
City, State (County) | Battle Creek, MI 49037 (Calhoun County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Accepting Letters of Interest |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This Statement of Work describes the service necessary to overhaul the Steam Turbine located at 5500 Armstrong Road, Battle Creek, Michigan, Combined Heating and Power (CHP) plant. Equipment consists of a complete Engineered Turbine Generator skid (attached). This includes a Coppus Model RLHA-24 steam turbine, a Murray model K steam turbine, a Lufkin Gear model N1400C gearbox, and an Ideal Generator model SAB 2200 kW generator with Ewing Controls. Contractor will provide Craft labor support with supervision, tooling/specialty tooling, forklift, air compressor, on-site glassbead/sandblast and other miscellaneous special tooling/handling equipment. Turbine/generator inspection and overhaul. This includes, but not limited to: Base Scope: Packaged Steam Turbine and Generator Outage • Borescope the LP • Pull cover on the HP to inspect turbine rotor and replace carbon seals • Inspect bearings. HP(2) HP thrust(1) LP(2) thrust(1) Gearbox(4) thrust(1) Generator(2) • Inspect HP trip valve • Inspect HP control valve • Inspect gear box. Perform a gear contact check • Pull generator end shields and check end windings and rotor in place • Electrical checks on generator rotor, stator and exciter. • Open and inspect HP non-return valve. Paper check on disk to seat. Lift check for bushing clearances. • PM checks on Woodward governor and start up support • Stator testing. Power Factor, Megger, Winding Resistance • Rotor testing. Megger, Winding Resistance • Brush-less Exciter. Megger, visual inspection • Generator Breaker. Maintenance cleaning & Inspection, Megger, Contact Resistance, • Test integrity of Hi-pot Vacuum Bottles. • Generator Cables to the breaker. Megger • Generator Protection Relay. Test the programed functions and verify if trip power is available. • Renew lubricating oil • Drain water and dirt from reservoir/ bearing housing; top off oil as needed • Check instrument air & lube oil filters; replace as needed Provide a completed report with overhaul findings/corrections/recommendations. QUALIFICATOINS The contractor shall provide certification and/or experience with Turbine/Generator inspecting and testing of a Coppus Model RLHA-24 steam turbine, a Murray model K steam turbine, a Lufkin Gear model N1400C gearbox, and an Ideal Generator model SAB 2200 kW generator with Ewing Controls. The contractor will provide Craft labor support with supervision, tooling/specialty tooling, forklift, air compressor, on-site glassbead/sandblast and other miscellaneous special tooling/handling equipment. The contractor shall provide certification and/or experience of mechanical maintenance which will include tooling and supervision. The contractor shall provide certification and/or experience of Turbine/Generator Control knowledge, calibration, and testing for the turbine/generator system identified in 4.a. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |