Similar Projects
Approximately 5,280 Feet of Ditching and Replacing Culverts
Infrastructure
Post-Bid
Patten, ME

Drainage Improvements
Infrastructure
Post-Bid
Lincoln, ME

Stoneybrook Drainage Improvements Project
Results
Hermon, ME

Supply and Delivery Of Precast Concrete Box Culverts/Located in Brewer-Eddington on Route 9 Connector
Results
Brewer, Eddington, ME

Supply and Delivery of Precast Concrete Box Culvert
Results
Less than $1,354,000 est. value
Brewer, Eddington, ME

Line Road Culvert Replacement Project
Results
Corinna, ME 04930

Sunken Bridge Road Culvert Replacement Project
Results
Corinna, ME 04928

Large Culvert Replacement
Results
ME

Hildreth Street Drainage
Results
Bangor, ME 04401

Capehart Fluvial Geomorphology and Stream Restoration Reach A5
Infrastructure
Results
Bangor, ME

2021 North Main Street Drainage Improvements Project
Infrastructure
Results
Brewer, ME

Building 253 - Floor Drain Project for the Bangor International Airport
Infrastructure
Results
Bangor, ME 04401

Containment Pond Alternative Routing
Infrastructure
Results
Bangor, ME 04401

Pleasant Street Drainage Improvement - Phase 1
Infrastructure
Results
Milford, ME 04461

Z--Brush,Grade,Drain Philpott Bridge Road
Term Contract
Results
Millinocket, Penobscot, ME 04462

Last Updated 04/28/2022 11:05 PM
Project Title

2022 Little John Lane Storm Drain Replacement and Erosion Control Project

Physical Address View project details and contacts
City, State (County) Brewer, ME   (Penobscot County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Storm drain replacement and erosion control project in the area of Little John Lane in the City of Brewer. A run of storm drain from the corner of Rotherdale Road to the outlet in the ditch will be removed and replaced. One catch basin will be demolished and replaced and one other one will be installed. Work will be required on an existing catch basin to create a new invert for a larger pipe. All new storm drain will be 24” HDPE stormdrain/underdrain Erosion control work in a large drainage ditch will also be done under this project. The contractor will be installing riprap on the inlet and outlet ends of several drainage pipes. Minor tree removal is expected.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents