Similar Projects
Rehabilitation Taxiway B North - City of Billings
Infrastructure
Conception
$1,320,000 CJ est. value
Billings, MT 59105

Public Ramp - Northside Expansion - Phase 2 - City of Billings
Demolition, Infrastructure
Conception
$1,750,000 CJ est. value
Billings, MT 59105

Cargo Ramp - Slot 5 Expansion - City of Billings
Renovation, Infrastructure
Design
$5,890,000 CJ est. value
Billings, MT 59105

Lead Service Replacements
Infrastructure
Design
$600,000 CJ est. value
Billings, MT 59101

WRF Nutrient Recovery Improvements
Infrastructure
Bidding
$9,000,000 CJ est. value
Billings, MT 59101

WRF Nutrient Recovery Improvements
Infrastructure
Bidding
$9,000,000 CJ est. value
Billings, MT 59101

Lead Service Replacements
New Construction, Demolition
Post-Bid
Billings, MT

Schedules 1-4, Water and Sewer Main Replacement
Infrastructure
Post-Bid
Billings, MT

Water System Improvements
Infrastructure
Results
Billings, MT 59105

Alkali Creek Water and Sewer Extension
Infrastructure
Results
Billings, MT

Shop World 3 Subdivision
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Billings, MT 59106

Falcon Ridge 4 Plex
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Billings, MT 59106

Riverfront Park Trail - City of Billings
Infrastructure
Conception
$1,500,000 CJ est. value
Billings, MT 59101

Coca-Cola Bottling Companies New Facility / Billings
New Construction, Infrastructure
Design
$23,700,000 CJ est. value
Billings, MT 59101

Gorham Park Irrigation System Replacement
Infrastructure
Bidding
$200,000 CJ est. value
Billings, MT 59102

Last Updated 05/16/2023 04:33 AM
Project Title

Landfill Slope Stability Improvements

Physical Address View project details and contacts
City, State (County) Billings, MT 59101   (Yellowstone County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $530,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally consists of stabilizing a steep sloping bluff located south of Jellison Road and east of the entrance to the City of Billings Regional Landfill. The work shall include, but not be limited to, the following tasks: Mobilizing and demobilizing personnel, equipment, supplies, and incidentals; Excavating, loading, hauling, and stockpiling overburden material; Grading and compacting subgrade material; Loading, hauling, and placing OWNER provided topsoil; Procuring, applying, and incorporating organic compost amendment; Procuring, applying, and/or incorporating fertilizer and seed to revegetate disturbed ground including regraded slopes and cover materials; Applying and anchoring OWNER provided wood mulch; Permitting, procuring, installing, inspecting, and maintaining storm water BMPs; and Other miscellaneous work. Erosion Control/Slope, Bank Stabilization, Sitework/Excavating and Grading, Grade and Surface, Excavation, Landscaping - Seeding, Erosion Control - Temporary. Site Directions: Billings Regional Landfill 5240 Jellison Rd. Billings, MT 59101 Slope is located south of Jellison Rd. and east of main entrance.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents