Similar Projects
Water - Planning Western Intake and Plant - Chatham County
New Construction, Infrastructure
Conception
$6,201,099 CJ est. value
Pittsboro, NC 27312

Schools - Wastewater Replacement at Silk Hope School - Chatham County
Infrastructure
Conception
$585,000 CJ est. value
Siler City, NC 27344

Friendship Village Multi-Residential Development / Apex
New Construction, Infrastructure
Design
$45,000,000 CJ est. value
Apex, NC 27502

Chatham Park Encore Community
New Construction, Infrastructure
Design
$115,000,000 CJ est. value
Pittsboro, NC 27312

Installation of ADA Curb Ramp
Infrastructure
Bidding
$300,000 CJ est. value
Siler City, NC 27344

Installation of ADA Curb Ramp
Infrastructure
Bidding
$300,000 CJ est. value
Siler City, NC 27344

RFQ D/B - Highway Construction in Moncure, Chatham County
Infrastructure
Post-Bid
$900,000 est. value
Pittsboro, NC

Construction of Concrete Sidewalk
Infrastructure
Post-Bid
$200,000 CJ est. value
Pittsboro, NC 27312

Intersection Improvement NC 751 and SR 1731
Infrastructure
Results
NC

Microsurfacing Treatment
Infrastructure
Results
$765,330 CJ est. value
Apex, NC 27523

The Oak View at Siler City Apartments
New Construction, Infrastructure
Construction
$12,500,000 CJ est. value
Siler City, NC 27344

John Palmour Manufacturing Center for Silicon Carbide
New Construction, Infrastructure - 1,000,000 SF
Construction
$2,500,000,000 CJ est. value
Siler City, NC 27344

Project Real
New Construction, Infrastructure - 150,000 SF
Pending Verification
$16,000,000 CJ est. value
Apex, NC 27502

Mellott Mixed Use
New Construction, Infrastructure - 785,000 SF
Pending Verification
$700,000,000 CJ est. value
Pittsboro, NC 27312

Vickers Village
New Construction, Infrastructure - 20,000 SF
Conception
$70,000,000 CJ est. value
Pittsboro, NC 27312

Last Updated 10/18/2023 09:38 AM
Project Title

Replacement of Bridge No. 306

Physical Address View project details and contacts
City, State (County) Siler City, NC 27344   (Chatham County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $1,097,633 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

County: Chatham WBS Element No.: BP8.R008.3 TIP Number: N/A Replacement of Bridge No. 306 over Prong of Rocky River on SR 1303 (Ben Smith Road) The date of availability for this contract is the date the Contractor begins work but not before October 30, 2023, or later than January 30, 2024. The completion date for this contract is one hundred eighty (180) days after completing Intermediate Contract Time Number 1. For questions, please contact me at (910) 773-8034 or cgbrown1@ncdot.gov NC DOT - Replacement of Bridge No. 306

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents