Project Title

Northwest Science Quad Supplemental Utility Plant

Physical Address View project details and contacts
City, State (County) Storrs, CT 06268   (Tolland County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method
Project Status Construction Commenced June 2020
Bids Due View project details and contacts
Estimated Value $50,000,000
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Includes the construction of a new chilled water plant and electrical substation to support expansion of the Northwest Science Quad at UConn Storrs. Work includes a 40,000 sf building and 100 lf of utility tunnel. Goals: Small and Minority Businesses (SBE) are encouraged. Bid Group 1A: 01-5626 Temporary Fence 01-7123 Surveying 01-7419 Construction Waste Management & Labor 02-2900 Site Clearing 07-8100 Applied Fireproofing 07-8410 Firestopping 09-6510 Flooring 09-9000 Painting 10-0000 Specialties 12-2000 Window Shades 26-0050 Temporary Electrical Work 27-1000 Communications 28-2000 Security 32-1000 Paving 32-1313 Site Concrete 32-3000 Landscaping 32-3100 Fences and Gates Bid Group 1B: 03-3000 Cast-in-Place Concrete 03-3010 Flatwork Concrete 05-1200 Structural Steel & Metal Deck 07-1100 Dampproofing & Waterproofing 07-4200 Exterior Wall Systems 07-5400 Roofing 08-1110 Doors, Frames & Hardware 11-0000 Overhead Doors & Loading Dock Equipment 14-0000 Elevators 14-5000 Gantry & Davit Cranes 22-0000 Plumbing 26-6000 Electrical Switchgear Equipment 31-0000 Sitework Bid Group 2: 05-5000 Miscellaneous Metal Fabrications 05-5100 Cooling Tower Support Steel 09-1000 General Trades 23-0000 HVAC 26-0000 Electrical Bid Group 3: 11-0000 - Overhead Doors & Loading Dock Equip - MBE - $60,000 14-0000 - Elevators - open - $150,000 26-0050 - Temporary Electrical Work - MBE - $180,000

Details

1 Water Treatment Plant, 40,000 SF New Construction.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.