Similar Projects
San Souci Road Elevation Design
Infrastructure
Design
WA

UST Inspect Maintain and Repair
Alteration
Design
$1,000,000 est. value
WA

I-90/I-5, E Sunset Way Vic and Nb Lowell Rd Vic Pccp Exp Jnt Rehab and Deck Overlay
Infrastructure
Bidding
Less than $1,250,000 est. value

2nd Street Water and Roadway Improvements
Alteration
Bidding
$1,150,000 to $1,200,000 est. value
North Bend, WA

Transit Facility Improvements Work Order
Infrastructure
Post-Bid
WA

150Th Ave Se / Se 38Th St To Eastgate Way - Roadway Improvements
Infrastructure
Post-Bid
Bellevue, WA

Construction of the 34th Avenue S, South 166th Street to South 160th Street
Infrastructure
Results
$6,250,000 to $7,250,000 est. value
Sea-Tac, SeaTac, WA 98188

SR 516 - Jenkins Creek to 185th Pl SE
Infrastructure
Results
Covington, WA 98042

2022 Western Region Pavement Preservation MATOC
Alteration
Bidding
$300,000 to $10,000,000 est. value

West Valley Highway (Strander Boulevard to I-405)
Infrastructure
Post-Bid
$3,400,000 to $4,000,000 est. value
Tukwila, WA

124th Avenue NE- NE 12th Street to NE Spring Boulevard
Infrastructure
Results
$8,221,853 est. value
Bellevue, WA 98007

SR 18, SR 99, SR 516, Jenkins Ck Vic and Tukwila Vic and SR 181 Vic Paving and Deck Rehab and ADA
Infrastructure
Bidding
$7,500,000 to $10,000,000 est. value
WA

Engineering Services
Alteration
Post-Bid
Issaquah, WA

I-90, SR18 I/C to Deep Creek - Interchange Improvements and Widening Project
Infrastructure
Results
WA

Marine View DR to SR 529 Corridor and Interchange Improv
Infrastructure
Bidding
WA

Last Updated 02/22/2022 05:42 PM
Project Title

CRT5 Repair Construction

Physical Address View project details and contacts
City, State (County) WA   (King County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Pre-Solicitation, Bidding Expected fourth quarter 2023
Bids Due View project details and contacts
Estimated Value $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Repair approximately 150-feet of the Cedar River Trail 5 facility, located at River Mile 9.4 of the Cedar River.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents