Similar Projects
Lift Station 317 Major Upgrade Progressive Design Build
Renovation
Bidding
Boynton Beach, FL

Kaye Street Re-Pump Station Building Expansion
Addition
Post-Bid
West Palm Beach, FL

Lift Station 82 Rehabilitation
Post-Bid
Jupiter, FL

Irrigation Pump Stations, Repair Services, Term Contract
Term Contract
Results
West Palm Beach, FL 33415

Lift Station Nos.12 and 14 Improvements
Results
Less than $1,085,000 est. value
Lake Worth, FL 33460

Country Club Irrigation Improvements and Pump Station
Post-Bid
North Palm Beach, FL 33408

Rehabilitation of Pumps D-16 and D-18
Results
Less than $1,000,000 est. value
Palm Beach, FL 33401

Improvements To Lift Stations 393, 1023 And 8168
Renovation
Post-Bid
Belle Glade, West Palm Beach, FL

Lift Station No. 153
Results
Less than $400,000 est. value
West Palm Beach, FL 33411

Improvements to Master Repump Station 9-North WUD
Post-Bid
$3,200,000 est. value
West Palm Beach, FL

Lift Station Rehabilitation Continuing Construction Contract 2020 WUD
Term Contract
Results
Less than $7,200,000 est. value
West Palm Beach, FL 33416

Lift Station Rehabilitation Project - Bid Package 2
Results
Less than $5,960,000 est. value
FL

Lift Station 53 Improvements
Results
$350,000 to $500,000 est. value
West Palm Beach, FL 33407

Gumbo Limbo Nature Center Seawater Intake Replacement and Pump Station
Results
$3,100,000 est. value
Boca Raton, FL 33432

Woodlands Park Sewer Improvements
Results
Less than $300,000 est. value
Boca Raton, FL 33434

Last Updated 11/12/2020 09:33 PM
Project Title

STA 1W Expansion 2 G-782 Pump Station

Physical Address View project details and contacts
City, State (County) FL   (Palm Beach County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $34,000,000 to $37,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: Project includes but is not limited to; construction of the G-782 (Outflow) Pump Station Package which includes the construction of the pump station and portions of the Canals and Levees associated with the pump station. The construction also includes associated canals, levees, parking areas, access roadways, culverts, boat ramps, maintenance ramps, FPL Distribution and fiber optic duct banks, underground fiber optic link, and all other associated appurtenances shown or referenced within the Contract Documents. Directions: From North and South: From I-95 or Florida Turnpike, turn west onto Southern Boulevard, then turn left onto E. Canal Street South (CR880). Follow CR 880 for about 4-miles to the vicinity of structure G-341, then left (South) onto a dirt road (levee) for about 5.5-miles to the vicinity of pump station G-310. The site begins just west of the G-310 pump station and continues for 6-miles south just west of the L-7 levee for the project connection canal, and then another 3-miles south to the S-6 pump station for the STA area which lies between the L-7 and L-15 levees.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents