Similar Projects
Cummings K8 and East High School Paving Project
Infrastructure
Design
$250,000 est. value
Memphis, TN

Master Paving Contract
Infrastructure
Bidding
$3,841,000 est. value
Memphis, TN

Resurfacing on SR 57
Infrastructure
Bidding
$500,000 est. value
Memphis, TN 38138

Concrete Replacement and Asphalt Pavement
Post-Bid
Bartlett, TN

Asphalt Recess Surface and Walking Path
Post-Bid
Memphis, TN 38106

Street Resurfacing Spring 2021
Results
Collierville, TN

ADA Curb Ramps - Group 63
Results
$312,732 est. value
Memphis, TN

Asphalt Pavement
Infrastructure
Bidding
$340,000 est. value
Bartlett, TN

Arlington Bike and Pedestrian Trail
Post-Bid
Arlington, TN 38002

ADA Curb Ramps - Group 62
Results
$633,100 est. value
Memphis, TN

North Front Street Infrastructure Improvements
Post-Bid
Memphis, TN 38167

FY 2021 Asphalt Paving, North Section
Results
Memphis, TN 38103

Parking Lot Resurfacing - Collierville Schools
Post-Bid
Collierville, TN 38017

FY 2021 Asphalt Paving, South Section
Results
Memphis, TN 38103

Sidewalk Replacement and Improvements
Post-Bid
Memphis, TN

Reported 06/09/2022 12:00 AM
Project Title

Fulton Courtyard - Southwest Tennessee Community College

Physical Address View project details and contacts
City, State (County) Memphis, TN 38134   (Shelby County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construction will include storm system modifications, concrete staining, new concrete sidewalks and plaza, concrete curbing/wall, site lighting and power pedestals, landscaping and irrigation. All work associated with site preparation, including but not limited to erosion control, demolition, vegetation removal, and pressure washing existing concrete to remain. Construction will include storm system modifications, concrete staining, new concrete sidewalks and plaza, concrete curbing/wall, site lighting and power pedestals, landscaping and irrigation. Construction will include other improvements or testing necessary and incidental to the noted project and shall be per the drawings and specifications.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents