Similar Projects
Replacement of Captain Tom's Booster Pump Station (Lamplig) - Town of Natick
Infrastructure
Conception
$760,000 CJ est. value
Natick, MA 01760

Replacement of Captain Tom's Booster Pump Station(Lamplight And Coachman Lane) - Town of Natick
Renovation
Conception
$760,000 CJ est. value
Natick, MA 01760

Miland Avenue Pump Station Improvements Project
Renovation, Infrastructure
Bidding
$335,000 CJ est. value
Chelmsford, MA 01824

RFP - Redevelopment of 15 Direct Push Wells and Barrows Well Field
Renovation
Bidding
$300,000 CJ est. value
Wilmington, MA 01887

On-Call Pump Station Services
Term Contract
Post-Bid
$60,000 est. value
Tewksbury, MA

Poplar Street Pump Station
New Construction
Post-Bid
$100,000,000 est. value
Somerville, MA

Marlborough Emergency Pump Station Connection
Results
$713,800 est. value
Marlborough, MA

Sewer Pump Station Maintenance and Repairs
New Construction
Results
$77,000 est. value
Lexington, MA

Evergreen Well and Pump Station Modifications
Renovation, Infrastructure
Bidding
$500,000 CJ est. value
Natick, MA 01760

Mill Pond Water Treatment Plant PFAS Treatment Upgrades Contract 2
New Construction
Post-Bid
$7,000,000 est. value
Burlington, MA 01803

The Commons Grinder Pump Station
New Construction
Results
$50,000 est. value
Belmont, MA

Inspection and Repair of Sewer Pump Station
Renovation
Post-Bid
$125,000 est. value
Somerville, MA

Installation of a New Sanitary Grinder Pump Station
New Construction
Results
$50,000 est. value
Belmont, MA

Mill Pond Water Treatment Plant PFAS Treatment Upgrades Contract 2 - Filed Sub Bid
New Construction
Post-Bid
$7,000,000 est. value
Burlington, MA 01803

Hayden Avenue Wastewater Pump Station Upgrade
Infrastructure
Results
$1,200,000 est. value
Lexington, MA 02421

Last Updated 12/21/2022 11:11 AM
Project Title

Wastewater Treatment Facility Phase 2 Upgrades - GC Bid

Physical Address View project details and contacts
City, State (County) Hudson, MA 01749   (Middlesex County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $17,954,599 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Hudson will prequalify General Contractors and Subcontractors for the construction of the Hudson Wastewater Treatment Facility Phase 2 Upgrades. Prequalification will be established through the Request for Qualifications process in accordance with M.G.L.Ch.149 Section 44D1/2 & 44D3/4. Project work includes renovations and equipment upgrades to the Main St Pump Station, Control, Headworks, & Process Buildings; replacement of Trickling Filter and Activated Sludge Clarifier Mechanisms; Aeration System Upgrades; installation of new generators; install/replace slide gates; misc. yard structures and other improvements. Bid Alternate 1 is concrete tank coatings. Sub Bid Deadline 8/3/22 Time 2:00 P.M. The required contract completion period is 730 consecutive days. This RFQ is for Contractor Prequalification and NOT a construction project out to bid. Firms previously prequalified for the Project in March 2022, remain prequalified and do not need to resubmit, refer to RFQ for details. The goals for this project are a minimum of 4.20 percent D/MBE participation and 4.50 percent D/WBE participation by certified DBEs.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents