Similar Projects
Repair Sidewalks / Install Pull-out Lane Project
Alteration
Design
$25,000 to $100,000 est. value
Tomah, WI 54660

2022 Parking Lot Maintenance
Infrastructure
Bidding
Baldwin, WI 54002

C. Wisconsin Rapids, W. Jackson Street, W. Riverview Exp - Jackson Street Bridge
Infrastructure
Bidding
WI

2021 Lateral Replacement
Post-Bid
Two Rivers, WI

2021 Lateral Replacement
Post-Bid
Two Rivers, WI

Central Campus Utilities - General
Results
Less than $3,000,000 est. value
Whitewater, WI 53190

Central Campus Utilities - General
Results
Less than $3,000,000 est. value
Whitewater, WI 53190

Street and Utility Improvements
Infrastructure
Bidding
Edgerton, WI 53534

2021 Sidewalk Improvement Project
Post-Bid
$103,605 est. value
Portage, WI

CSO 102 Rehabilitation - Humboldt
Results
Milwaukee, WI

Utility Extensions Porter Road to Commons Circle
Infrastructure
Bidding
Plover, WI 54467

Forest Avenue Reconstruction
Post-Bid
West Bend, WI

First Park 94 - Phase II Utilities
Results
Somers, WI

2022 Sanitary and Water Main Replacement - North Avenue
Infrastructure
Bidding
Little Chute, WI 54140

2021 Kansas Street - Street and Utility Improvements
Post-Bid
Horicon, WI 53032

Last Updated 03/24/2022 04:20 PM
Project Title

2022 Street and Utility Improvements

Physical Address View project details and contacts
City, State (County) Tomah, WI   (Monroe County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sanitary Sewers, Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $173,094,050
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sanitary sewer, water main, storm sewer and street reconstruction, including these units: 8-inch Sanitary Sewer (3,100 lineal feet), 8-inch Water Main (4,200 lineal feet), 12-inch to 30-inch Storm Sewer (500 lineal feet), 24” Concrete Curb & Gutter (4,000 lineal feet), Concrete Flatwork (20,500 square feet), and Street Reconstruction (2,100 lineal feet).

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents