Similar Projects
UF DHRE Housing Main Office & Beaty Commons Roof Replacements
Post-Bid
Gainesville, FL

National Roofing Program (NRP) Design/Build 81st
Post-Bid

Sheriff Office Roof Replacement
Results
Less than $820,000 est. value
Gainesville, FL 32641

Z--Remove & Replace - Approx 11,400 Sqft Flat Roof and 3428 Sqft Low-Slope Roof
Results
$250,000 to $500,000 est. value
Gainesville, FL

National Roofing Program (NRP) Design/Build Nationwide
Post-Bid

Glennetta Taylor Roof Replacement
Results
Gainesville, FL

Lake City Correctional Facility Reroof Phase II Project
Post-Bid
Gainesville, FL

Denise Pompili Roof Replacement
Results
Less than $12,239 est. value
Gainesville, FL

Building 0092 Physics Re-Roof Phase 2
Post-Bid
Gainesville, FL 32610

Public Works Fleet Roof Replacement
Results
Less than $80,000 est. value
FL

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Post-Bid

Criminal Courthouse Roof Repairs
Results
Less than $49,803 est. value
Gainesville, FL 32601

MATOC - Army Reserve National Roofing Program (NRP)
Post-Bid
Less than $95,000,000 est. value

Santa Fe High School Roof Replacement, Building 32
Results
Alachua, FL

Howard Bishop Middle School Roof Replacement Building 30
Results
Gainesville, FL 32600

Reported 12/11/2018 11:52 AM
Project Title

Building 0021 Florida Gymnasium Re-Roof Project

Physical Address View project details and contacts
City, State (County) Gainesville, FL   (Alachua County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status All Sub-Bids Received
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description BBI Construction Management, Inc. will be accepting bids for MP01329- Building 0021 Florida Gymnasium Re-Roof Project - University of Florida, Gainesville, Florida for the following scopes: Metals, Fall Protection, Roofing, Paints & Coatings, Plumbing, HVAC, Electrical. The roofer must be able to provide a payment and performance bond and be certified in writing by the roofing materials manufacturer to install the proposed roof system. Additionally, bidder must have experience with projects of a similar scope, equal size and complexity.
Details
Division 05 - Metals.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting and Coating.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents