Similar Projects
Y1DA--FY21 NRM Tier 2 (PROJ: 573-20-106) DB - Replace Flanged Valves Hospital Wide
Design
$1,000,000 to $5,000,000 est. value
Gainesville, FL 32608

Maintenance and Repair of Two Cleaver Brooks Boiler
Alteration
Bidding
Miramar, FL 33027

Chiller for Osceola Technical College (oTECH)
Alteration
Bidding
Kissimmee, FL 34744

Ground Transportation Facility GMP 8S.1
Post-Bid
Orlando, FL 32827

FAU Boca Building 38 Boiler Replacement and Electrical Switch Gear Upgrade
Post-Bid
Boca Raton, FL 33431

J--Service: Gainesville Chiller Plant Maintenance
Results
Gainesville, FL 32608

Resins for Per Fluorinated Treatment System
Term Contract
Results
Stuart, FL 34994

Crystal River High Freezer/Cooler Remodel
Alteration
Bidding
Crystal River, FL 34428

Rehabilitation Work - 7332 Johnson Road
Post-Bid
Less than $10,000 est. value
Port Richey, FL 34668

Repair Munters ADU-300 Unit at Everglades National Park
Results
Homestead, FL 33030

Bally Indoor Walk-in Cooler/Freezer Unit
Alteration
Bidding
Gainesville, FL

Rehabilitation Program - 7531 Jenner Avenue
Post-Bid
Less than $10,000 est. value
New Port Richey, FL 34655

J041--Steam Station - Repair/Replace Please Read Notice Thoroughly
Results
Miami, FL 33125

Boiler and Water Heater Inspections and Repairs
Term Contract
Bidding
$75,000 est. value
FL

Rehabilitation Program - 18807 Autumn Lake Boulevard
Post-Bid
Less than $10,000 est. value
Hudson, FL 34667

Reported 02/10/2022 12:00 AM
Project Title

NGS N01 - High Energy Piping (HEP) Non-Destructive Examination (NDE) Project

Physical Address View project details and contacts
City, State (County) Jacksonville, FL   (Duval County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Nondestructive examinations (NDE) shall be completed on the JEA NS-1Main Steam, Hot Reheat, Cold Reheat, HP bypass, and LP bypass piping systems to establish the current condition of the material. Results shall be analyzed to estimate the remaining life of the piping systems based on the locations tested. Each NDE test location and method shall be considered for future testing and a recommended test frequency shall be provided. Following evaluation of NDE test results, additional testing shall be recommended if applicable.

Details

Division 02 - Existing Conditions.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents