Similar Projects
Boat Storage Facility
New Construction - 40,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Gloucester, MA

Little Beach Pier and Beach Maintenance Project
Conception
Falmouth, MA 02114

Drydock and Overhaul Services for the M/V Gayhead
Bidding
Falmouth, MA

Two Float Replacements
Bidding
Bourne, MA 02532

Rehabilitate Existing Timber at Eastern and Southern Piers
Post-Bid
Less than $618,000 est. value
Boston, MA

Neponset Landing II Spray Deck Renovation Demolition
Post-Bid
Less than $800,000 est. value
Boston, MA 02114

Removal and Replacement of Pilings, Floats, and a Gangway Located on the Onset Pier
Results
Less than $339,373 est. value
Onset, MA

Z--CACO - Replace Marconi Beach Stairs
Results
Wellfleet, MA

Crosby Yacht Yard
New Construction
Construction
Osterville, MA

Owner's Project Manager for New Bedford State Pier
Renovation
Post-Bid
$1,700,000 est. value
New Bedford, MA

Owen Park - Pier Repair for the Harbor Master
Results
Less than $50,000 est. value
Tisbury, MA

Middle Wharf Wale System Replaced
Post-Bid
Less than $60,000 est. value
Mattapoisett, MA 02739

Y--Hellcat Trail Boardwalk Replacement @ PR NWR
Results
Newburyport, MA 01950

Replacement of Winter Island Finger Floats
Post-Bid
Less than $40,000 est. value
Salem, MA 01970

Barlows Landing Dinghy Dock Improvement
Results
$260,000 est. value
Buzzards Bay, MA

Reported 12/05/2019 12:00 AM
Project Title

Regatta Point Waterfront Rehabilitation

Physical Address View project details and contacts
City, State (County) Boston, MA   (Suffolk County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $618,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Goals: The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. The Veteran-Owned Business Enterprise participation benchmark for this contract is 3.0%. Work consists of the project consists of but not limited to rehabilitation to the existing timber Eastern and Southern Piers, installation of a new sheet pile bulkhead and demolition of the existing concrete retaining wall, installation of the new access platform, installation of new access ramps.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents