Similar Projects
Milwaukie / El Puente Elementary Safe Routes to School Improvements - City of Milwaukie
Infrastructure
Conception
$5,196,000 est. value
Milwaukie, OR

I-205 Widening and Abernethy Bridge Seismic Upgrades Phase 1 and 2
Infrastructure
Conception
$500,000,000 CJ est. value
Oregon City, OR 97045

Jennings Ave: OR 99E to Oatfield Rd
Infrastructure
Design
$3,187,983 CJ est. value
Milwaukie, OR 97267

Jennings Ave: OR 99E to Oatfield Rd
Infrastructure
Design
$3,187,983 CJ est. value
Milwaukie, OR 97267

Fischer's Forest Park - Large Onsite Sewage System Treatment Process Upgrade
Infrastructure
Bidding
$800,000 CJ est. value
Oregon City, OR 97045

Willamette Falls Locks (WFL) Seismic and Safety Upgrades
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Oregon City, OR 97045

I-205 Improvements 1A - Or43 To Or213 Section of the East Portland Freeway
Infrastructure
Post-Bid
$30,000,000 est. value
OR

Museum of the Oregon Territory Parking Lot Repair
Infrastructure
Results
$115,000 est. value
OR

SAFE SSMP FY21 Improvement Project
Infrastructure
Results
$3,056,000 to $3,565,000 est. value
Milwaukie, OR

Mount Tabor Yard Maintenance Facility and Multimodal Pathway Project
New Construction
Construction
$13,500,000 est. value
Portland, OR

Public Works Operations Complex
New Construction, Infrastructure, Renovation
Construction
$19,000,000 CJ est. value
Wilsonville, OR 97070

162nd Avenue Residential Care Facility
New Construction, Infrastructure - 26,508 SF
Pending Verification
$6,000,000 CJ est. value
Happy Valley, OR 97086

162nd Avenue Residential Care Facility
New Construction, Infrastructure - 26,508 SF
Pending Verification
$6,000,000 CJ est. value
Happy Valley, OR 97086

Waluga Pressure Zone Pipe Resiliency Improvements: (R- 01) - City of Lake Oswego
Infrastructure
Conception
$1,140,000 CJ est. value
Lake Oswego, OR 97035

OR 213 at MP 15.71 (Toliver Rd)
Infrastructure
Design
$6,446,000 CJ est. value
Oregon City, OR 97045

Last Updated 01/08/2023 11:31 PM
Project Title

OR 43: Arbor Dr - Hidden Springs Rd

Physical Address View project details and contacts
City, State (County) West Linn, OR 97068   (Clackamas County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected February 2025
Bids Due View project details and contacts
Estimated Value $3,935,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct a new cycle track and sidewalk along OR-43 from Arbor Dr to Hidden Springs Rd and construct about 7,500 sq ft. of new road extending Hidden Springs Rd to Old River Rd. As of January 09, 2023, the project is in Design status. Anticipated letting date is August 02, 2024. ODOT - OR 43: Arbor Dr - Hidden Springs Rd *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents