Similar Projects
Patterson Road Sidewalk
Infrastructure
Conception
$250,000 CJ est. value
Columbia, SC 29209

Patterson Road Sidewalk
Infrastructure
Conception
$250,000 CJ est. value
Columbia, SC 29209

Shady Lane Force Main Replacement (SS7548) CDBE - Part 1
Infrastructure
Design
$661,770 CJ est. value
Columbia, SC 29206

Shady Lane Force Main Replacement (SS7548) CDBE - Part 1
Infrastructure
Design
$661,770 CJ est. value
Columbia, SC 29206

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Jackson Creek Site Restoration Project
Infrastructure
Post-Bid
Columbia, SC 29206

SC State House Portico Pavers North Side
Infrastructure
Post-Bid
$375,000 to $450,000 est. value
Columbia, SC 29201

Carolina Crossroads Phase 2 - Broad River Road at I-20 Interchange
Results
SC

Statewide Campground Utility Upgrades-Sesquicentennial State Park
Results
Columbia, SC 29223

Clutch Coffee / Columbia
New Construction, Infrastructure - 798 SF
Construction
$250,000 CJ est. value
Columbia, SC 29209

Finlay Park Development
Infrastructure
Pending Verification
$10,000,000 CJ est. value
Columbia, SC 29201

Colony Northpointe Recreation Project (Design Engineering for Bridge)
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Columbia, SC 29201

RFP - Stream Restoration at Forty Acre Hp
Infrastructure
Conception
$250,000 CJ est. value
Columbia, SC 29201

US 76 over US 601
Demolition, New Construction, Infrastructure
Design
$9,648,000 CJ est. value
Columbia, SC 29205

Last Updated 12/22/2022 05:34 AM
Project Title

Blythewood Road Widening Project

Physical Address View project details and contacts
City, State (County) Columbia, SC 29201   (Richland County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $10,061,778 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes widening Blythewood Rd (S-59) to five lanes between Syrup Mill Rd and I-77, including concrete shared-use path construction and curb and gutter and closed-drainage installations, hot mix asphalt paving, lighting and electrical (specific to the roundabout), demolition, grading, earthwork, signing, pavement markings, traffic control, and erosion control activities. The project also includes the construction of a roundabout at the intersection of Community Rd / Blythewood Rd / Cobblestone. Questions Due Date: Nov 29, 2022, 2:00 PM EST

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents