Similar Projects
Big Rig RV Park Buildings
New Construction - 7,250 SF
Bidding
$500,000 to $1,000,000 CJ est. value
Layton, UT 84041

2022 Utility Project
Infrastructure
Bidding
Syracuse, UT

WCSD Transportation Facility Addition
Addition
Post-Bid
Saint George, UT 84790

New Transportation Facility
New Construction
Post-Bid
Price, UT 84501

Casa Loma Drive Culinary Waterline and Storm Drain
Results
$300,000 est. value
Centerville, UT 84014

Lone Peak Elementary Storm Drain Upgrade
Results
Sandy, UT 84092

Installation of A Storm Drain Line Extension On 200 East
Construction
Enterprise, UT 84725

Annual Contract for Sewer and Water Mains Repairs
Infrastructure
Bidding
Salt Lake City, UT

Storm Sewer Cleaning and Maintenance
Term Contract
Post-Bid
Salt Lake City, UT 84114

Storm Drain Improvement Project FY 2020
Results
Less than $374,135 est. value
Pleasant Grove, UT 84062

Retrofit Existing Stormwater Grate
Post-Bid
Riverton, UT 84096

Cove Fort MS4 Project
Term Contract
Results
Cove Fort, UT 84637

Bus Stop Enhancements 2020
Post-Bid
Salt Lake City, UT 84114

DFCM Construction General Contractors - DWR Rosebud Bunkhouse
New Construction, Demolition - 2,230 SF
Results
$500,000 est. value
Park Valley, UT 84329

2020 Storm Drain Projects
Post-Bid
Less than $575,955 est. value
Bountiful, UT

Last Updated 10/15/2021 10:41 AM
Project Title

Construction Manager for Clearfield Station

Physical Address View project details and contacts
City, State (County) Clearfield, UT   (Davis County)
Category(s) Sewer and Water, Transportation
Sub-Category(s) Misc. Structures, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located at the present UTA Frontrunner Station on Highway 126 in Clearfield City. There will be two offsite utility improvements (water and sewer) and 3 UDOT intersection alterations/additions. The existing Depot Street south of SR 193 will extend parallel along the Frontrunner railway and turn to connect to 1450 South across SR-126. The total area of the project is approximately 60 acres.

Details

Misc. Structures, New Construction.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents