Similar Projects
Murphy USA #7206/7851 / Glasgow
Demolition, New Construction, Infrastructure - 208 SF
Conception
$1,500,000 CJ est. value
Glasgow, KY 42141

Dever Golf Cart Sales and Service Center
New Construction, Infrastructure - 16,630 SF
Conception
$2,500,000 CJ est. value
Louisville, KY 40245

Caliber Collison - Abercrombie and Associstion
New Construction, Infrastructure - 14,704 SF
Design
$4,000,000 CJ est. value
Walton, KY 41094

Asphalt Resurfacing - KY 100
Infrastructure
Design
$300,000 CJ est. value
Franklin, KY 42134

Playworks Event Building & Restroom Building, Waterfront Development Corp., Phase IV
New Construction, Infrastructure
Bidding
$50,000,000 CJ est. value
Louisville, KY 40202

Playworks Event Building & Restroom Building, Waterfront Development Corp., Phase IV
New Construction, Infrastructure
Bidding
$50,000,000 CJ est. value
Louisville, KY 40202

Elevated Water Storage Tank Painting, Modifications and Repairs
Infrastructure
Post-Bid
Campbellsburg, KY

Engineering Services for Bridge Design - Buffington Bridge Replacement
New Construction, Renovation
Post-Bid
Elsmere, KY

Distribution System Site Development
Renovation
Results
Burgin, Harrodsburg, KY 40330

Water Storage Improvements
Results
Frankfort, KY

Louisville Industrial Center Building H
New Construction, Infrastructure
Construction
$35,000,000 CJ est. value
Louisville, KY 40214

Fort Mitchell Continuing Care Retirement Community
New Construction, Infrastructure
Pending Verification
$200,000,000 CJ est. value
Fort Mitchell, KY 41017

Beaumont Middle School - Fayette County Board of Education
Renovation, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Lexington, KY 40504

Install Guardrail on KY-522 in Harlan County
Infrastructure
Conception
$634,000 CJ est. value
Totz, KY 40870

Orell Road Multi-Residential
New Construction, Infrastructure
Design
$90,500,000 CJ est. value
Louisville, KY 40272

Last Updated 10/07/2022 09:02 PM
Project Title

RFP-122-23 KASTOW - Orphan Well Package - Casey 001

Physical Address View project details and contacts
City, State (County) Liberty, KY 42539   (Casey County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $625,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Kentucky Abandoned Storage Tank and Orphan Well Reclamation Program (KASTOW) Project Description: KASTOW - ORPHAN WELL PACKAGE - CASEY #001 This package includes reclamation of sites in Casey County.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents