Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$460,000 CJ est. value
Scott, PA 17815

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$460,000 CJ est. value
Scott, PA 17815

PA 56 - Rouzer Rd to SR 4030
Infrastructure
Design
$11,068,421 CJ est. value
Lincoln Township, PA 15521

PA 56 - Rouzer Rd to SR 4030
Infrastructure
Design
$11,068,421 CJ est. value
Lincoln Township, PA 15521

SR 4034 over I-99
Infrastructure
Bidding
$2,500,000 CJ est. value
Kimmel Township, PA 16655

New Multi-Tenant Building Enterprise Lane Lot 24 - Bedford County Business Park 1
New Construction, Renovation, Infrastructure - 2,400 SF
Bidding
$300,000 CJ est. value
Bedford, PA 15522

2023 D9 Interchange Lighting
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Manns Choice, PA 15550

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Alterations and Additions to Bedford High School - Sitework Construction
Results
$5,360,563 est. value
Bedford, PA 15522

Asphalt Resurfacing
Results

Us 22/322 Pm
Infrastructure
Conception
$2,850,000 est. value

PA 26 Riddlesburg - Saxton
Infrastructure
Design
$8,181,482 CJ est. value
Saxton, PA 16678

Asphalt Resurfacing
Infrastructure
Post-Bid
PA

2021 Road Improvement Project
Results

Last Updated 09/27/2022 10:21 AM
Project Title

Slope Repairs and Remediation Between Milepost 146.05 and Milepost 159.64

Physical Address View project details and contacts
City, State (County) Everett, PA 15537   (Bedford County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2020 , Construction documents
Bids Due View project details and contacts
Estimated Value $11,732,513 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of April 20, 2020, the advertisement for this contract has been cancelled. No time frame for re-advertising has been established. This project provides for slope repairs along the Turnpike roadway shoulders. Work includes drainage improvements, guiderail replacement, single face barrier installation, rock armor installation, and maintenance and protection of traffic. Work items include, but are not limited to: 14,442 CY Excavation, Various Types 5,190 SY Geotextile, Class 4, Type A 2,600 SY Geogrid, Class 1, Type A 12,372 TON Superpave Asphalt Mixture, HMA Courses, Various Mixes 7,797 TON Subbase (No. 2A) 3,401 TON Subbase under Guide Rail 12,996 SY Milling of Bituminous Pavement Surface, 2" Depth 5,549 LF Pavement Base Drain with Slope Drainage, Type II 22,556 LF Remove Existing Guide Rail 20,662.5 LF Type 31-S Guide Rail 6,358 LF Single Face Concrete Barrier, 52" 34,440 LF Temporary Concrete Barrier and Temporary Impact Attenuator 4,291 SY Shoulder Backup 7,360 SY Mulching-Bonded Fiber Matrix 2,299.5 LF Rock Armor 24,699 CY Rock Armor, Modified 7,442 LF Compost Filter Sock, 12" Diameter 2,556 LF Compost Filter Sock, 18" Diameter 22,817 LF Compost Filter Sock, 24" Diameter 26,244 LF 6" Waterborne Pavement Markings Milepost 146.05 is located 0.55 mile east of the Bedford Interchange, Exit 146, and Milepost 159.64 is located 1.85 miles west of the Breezewood Interchange, Exit 161, both in Bedford County, Pennsylvania. The proposal and plans are published electronically in EBS and are available to registered business partners for downloading and printing. An electronic bid bond, from an approved vendor, with corporate surety, in the amount of five (5%) percent of the bid must be submitted with the proposal as bid security. The bid security of the three (3) low bidders will be retained until the execution of the contract. (The normal time for execution of the contract is approximately four [4] weeks.) A Prequalification Certification and Applicable Capacity Rating assigned by the Prequalification Office of the Pennsylvania Department of Transportation is a necessary prerequisite for bidding on this project. The opening and listing of bids not meeting all the terms and conditions of the bid advertisement or bid procedures does not act as a waiver or modification of any requirements contained in the bid advertisement or bid procedure. The Provisions of the Pennsylvania Prevailing Wage Act of August 15, 1961, P.L. 987, as amended, together with the rates and regulations promulgated by the Secretary of Labor and Industry applicable thereto, shall apply to this contract. Any questions for this project must be submitted electronically in EBS by registered business partners.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents