Similar Projects
Design Build Services for Lower Westchester Bridge Bundle
Post-Bid
NY

Rehabilitation of Willet Avenue and Highland Street Bridges
Term Contract
Post-Bid
Port Chester, NY

Design-Bid-Build 6th & 10th Avenue Bridges
Results
$15,000,000 to $60,000,000 est. value
Mount Vernon, NY 10550

Structures Where and When, Region-Wide
Results

Replacement of the Hill Boulevard Bridge over Barger Brook Tributary and Replacement of the Veterans Road Culvert over the Hallocks Mill Brook
Post-Bid
Yorktown Heights, NY 10598

Bridge Painting of Eight Bridges, Region Wide
Results

Emergency Repair of Hickory Grove Bridge
Post-Bid
Mamaroneck, NY 10543

2019 Bridge Washing and Deck Sealing Contract at Various Locations
Results

Statewide Emergency Bridge Contract
Results

Rehabilitation of Bronx River Parkway and Two Bridges (Bin 3348999 and Bin 3348950) from the Crosss County Parkway to Scarsdale Road
Term Contract
Results
$15,000,000 to $17,000,000 est. value
Yonkers, NY

Repainting of Pedestrian Bridge over Nepperhan Avenue
Results
Yonkers, NY 10701

Multi-Bridge Deck Joint Rehabilitation on I-87 between Milepost 2.20 and Milepost 70.68
Term Contract
Results

Rehabilitation of June Road Bridge Over Titicus River (Bin 1037480)
Results
$500,000 to $550,000 est. value
North Salem, NY 10560

Rehabilitation of Anita Lane Utility Bridge and Stream Bank Improvements
Results
$350,000 to $400,000 est. value
Mamaroneck, NY 10543

Rehabilitation of Various Bridges Ward Pound Ridge Reservation
Results
$750,000 to $850,000 est. value
Pound Ridge, NY 10576

Last Updated 08/14/2019 08:29 AM
Project Title

Wampus Brook Park South Bridge Replacement

Physical Address View project details and contacts
City, State (County) Armonk, NY 10504   (Westchester County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Project includes the removal and replacement of the south pedestrian bridge with either a pre-fabricated or field-constructed steel bridge.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents