Similar Projects
Lincoln Avenue South of Wascher Drive To South of Killarney - City of Urbana
Infrastructure
Conception
$1,930,550 CJ est. value
Urbana, IL 61801

Lincoln Avenue South of Wascher Drive To South of Killarney - City of Urbana
Infrastructure
Conception
$1,930,550 CJ est. value
Urbana, IL 61801

Champaign County Detention Center Expansion
Addition, Demolition, Infrastructure
Design
$3,000,000 CJ est. value
Urbana, IL 61802

Rehabilitate Runway 18-36
Infrastructure
Bidding
$2,342,026 CJ est. value
Rantoul, IL 61866

Rehabilitate Runway 18-36
Infrastructure
Bidding
$2,342,026 CJ est. value
Rantoul, IL 61866

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

CH 20 Bridge Deck Replacement & Hot in Place Recycling with Asphalt Overlay
Renovation, Infrastructure
Results
$454,759 est. value
IL

Roadway Improvements
Infrastructure
Results
$3,411,116 est. value
Urbana, IL

Indian Grocery Store
Renovation, Alteration - 5,100 SF
Construction
Champaign, IL 61820

Hotel Royer Tapestry Collection by Hilton
Renovation, Infrastructure
Construction
$8,693,115 CJ est. value
Urbana, IL 61801

Windsor Road Resurfacing
Infrastructure
Pending Verification
$300,000 CJ est. value
Urbana, IL 61801

Windsor Road Resurfacing
Infrastructure
Pending Verification
$300,000 CJ est. value
Urbana, IL 61801

Pennslyvania Avenue West Of Orchard Street Resurfacing To Race - City of Urbana
Infrastructure
Conception
$617,150 CJ est. value
Urbana, IL 61801

Curbside Bagged Leaf Collection And Disposal Services
Alteration
Post-Bid
Urbana, IL

Last Updated 04/10/2023 07:09 AM
Project Title

Parkland College - 2023 Campus Site Restoration

Physical Address View project details and contacts
City, State (County) Champaign, IL 61821   (Champaign County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $650,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This Campus Site Restoration project consists of the following; Seal coating asphalt surfaces and restriping paint pavement marking at existing parking lots; Removal of asphalt pavement and replaced with PC Concrete Pavement 8"; Removal and replacement of Combination Curb and Gutter B-6.24; Removal and replacement of Concrete Curb, Special; Removal and replacement of Concrete Edging 4"; Concrete pad around existing water and gas valves; Removal and replacement of traffic sign panels and sign post for majority of the Campus Site parking lots and roadways Site Directions: PARKLAND COLLEGE 2400 WEST BRADLEY AVENUE, CHAMPAIGN, IL 61821

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents