Similar Projects
Adams Avenue Active Transportation Project - City Of Costa Mesa
Alteration
Conception
$3,750,000 est. value
Costa Mesa, CA 92626

City Hall - Cast Iron Drainage Repipe - City of Costa Mesa
Infrastructure
Conception
$300,000 est. value
Costa Mesa, CA 92626

Frank R. Bowerman Phase VIII - A1 Groundwater Protection
Infrastructure
Bidding
$60,000,000 est. value
Irvine, CA 92602

Provide Utility Locating Services
Infrastructure
Bidding
Anaheim, CA

Primary Sedimentation Basins No. 3-5 Replacement at Plant No. 1
Alteration
Post-Bid
CA

Santa Ana Trunk Sewer Rehabilitation
Infrastructure
Post-Bid
$31,850,000 est. value
Santa Ana, CA

Citywide Sanitary Sewer Improvement Program
Infrastructure
Results
Anaheim, CA 92805

CALLE REAL Waterline Improvements
Infrastructure
Results
$880,000 est. value
San Clemente, CA 92673

Country Hills Subdivision Pavement and Water Improvements - Phase 2
Infrastructure
Bidding
$1,900,000 est. value
Brea, CA

Center Greens Sanitary Sewer Improvements
Term Contract
Post-Bid
Anaheim, CA

Rural Ridge Circle and Wilshire Ave Water Main Replacement Project
Alteration
Results
$2,500,000 to $3,000,000 est. value
Anaheim, CA

Construction of Lampson Avenue / Springdale Street Sewer Improvements
Infrastructure
Bidding
$2,074,000 est. value
Garden Grove, CA 92845

Sewer Line Cleaning, Video Inspection, and Emergency Response
Infrastructure
Post-Bid
Orange, CA

Industrial Streets (Phase I) Water & Sewer Main Improvements
Infrastructure
Results
$4,000,000 est. value
Santa Ana, CA 92701

Sonar Inspection of Large Diameter Sewers and Siphons
Infrastructure
Bidding
Fountain Valley, CA

Reported 06/24/2022 02:21 PM
Project Title

Tewinkle Park Lakes Upgrades - 700137 - City of Costa Mesa

Physical Address View project details and contacts
City, State (County) Costa Mesa, CA 92626   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value Less than $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed Scope has not yet been Determined. As of June 23, 2022, this project is currently in the FY 2022-2026 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents