Similar Projects
Replace Hot and Cold Water Loops
Bidding
Less than $300,000 est. value
Ina, IL

Chiller
Bidding
Aledo, IL 61231

HVAC Preventative Maintenance Services, NWS Romeoville, IL
Post-Bid
Romeoville, IL 60446

HVAC Services - Collinsville
Term Contract
Post-Bid
Collinsville, IL

HVAC Equipment Replacement
Results
Evanston, IL 60201

Boiler Replacement at Indian Trail JHS
Renovation
Results
Addison, IL 60101

Galesburg AC Replacement
Bidding
Galesburg, IL

2B Cooling System Upgrade
Post-Bid
Romeoville, IL

Shawnee Community College Emergency HVAC
Renovation
Results
$75,000 to $100,000 est. value
Ullin, IL 62992

Update HVAC Controls - Temperature Controls
Bidding
Less than $700,000 est. value
Springfield, IL 62702

Coroner's Office Refrigerator and Freezer Replacement
Post-Bid
Wheaton, IL 60187

Campus Building Automation System Upgrade
Results
$600,000 to $700,000 est. value
Chicago, IL 60621

Update HVAC Controls - General
Bidding
Less than $100,000 est. value
Springfield, IL 62702

USACE Chicago District - Replace IIB Cooling System
Post-Bid
$500,000 to $1,000,000 est. value
Romeoville, IL 60446

Sports and Recreation Center HVAC Replacement
Results
De Kalb, IL 60115

Reported 03/24/2021 12:00 AM
Project Title

HVAC Duct Cleaning

Physical Address View project details and contacts
City, State (County) Crystal Lake, IL   (McHenry County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding, Construction Completion Expected April 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for this project will include cleaning of all HVAC ductwork and accessories at the City of Crystal Lake Municipal Complex, as outlined in the Equipment List: Appendix A. The extent of ductwork to be cleaned shall be determined by review of available construction documents referenced by Appendix B, and field verification. The filter schedule as outlined in the Filter Schedule: Appendix C, and field verification. The Contractor shall be responsible for the removal of visible surface contaminants and deposits from within the HVAC system in strict accordance with these specifications. The HVAC system includes any interior surface of the facility’s air distribution system for conditioned spaces and/or occupied zones. This includes all Heating, Ventilating and Air Conditioning systems from the points where the air enters the system to the points where the air is discharged from the system. The return fans, return air grilles, return air ducts to the air handling unit (AHU) or makeup air unit (MAU), interior surfaces of the AHU/MAU, mixing box, coil compartment, condensate drain pans, supply air ducts, fans, fan housing, fan blades, turning vanes, filters, filter housings, reheat coils, supply diffusers, dampers, sound attenuators, and UV-C lighting are all considered part of the HVAC system. The AHU/MAU outside air intakes, intake louvers, AHU exhaust, and exhaust louvers. The HVAC system may also include other components such as dedicated exhaust and ventilation components, makeup air systems, and combustion air systems. The Fire Department Day-Room kitchen exhaust system is included in the scope of work.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents