Similar Projects
Last Updated | 08/18/2022 09:04 AM |
Project Title | Wayne Terminal Lighting Upgrade |
Physical Address | View project details and contacts |
City, State (County) | Inkster, MI 48141 (Wayne County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $90,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work will be performed at the SMART Wayne Terminal, 30000 Industrial Drive, Inkster, MI 48141. The work shall be completed in accordance with the Final Design plans dated June 2022. The work covered by this contract includes, but may not be limited to, the items listed below. Removal and replacement of exterior lighting throughout the Terminal property as noted on the Drawings. Removal and replacement of interior lighting throughout the Terminal building as noted on the Drawings. Installation of new security cameras as specified in the locations noted on the Drawings. Buyers Requirements Participation Requirements General Requirements - Bid Deposit Required - Insurance Required - Installation Required - Prevailing Wage Required - Federally Funded - Certified Payroll Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Question Acceptance Deadline 08/03/2022 02:00 PM EDT Questions are submitted online Yes |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |