Similar Projects
Marine Science Center ADA Enhancements
Bidding
Less than $65,000 est. value
Ponce Inlet, FL 32127

Fleming Avenue ADA Sidewalk
Bidding
Less than $70,500 est. value
De Land, FL 32720

New Smyrna Beach High School Campus Wide Elevated Walkway Repairs
Post-Bid
New Smyrna Beach, FL 32168

Thornby Park Boardwalk and Trail Improvements
Post-Bid
Less than $286,000 est. value
Deltona, FL

Sweetheart Trail - Beach St. Wilder Blvd. to Shady Place
Results
Daytona Beach, FL 32100

Providence Boulevard Shared Use Trail
Results
Deltona, FL

New Hampshire Avenue ADA Sidewalk
Post-Bid
Less than $127,000 est. value
De Land, FL 32720

Sunrise Park Boat Ramp Improvements
Results
Less than $1,094,325 est. value
Holly Hill, FL

Dr. Martin Luther King, Jr. Blvd. Roadway and Pedestrian Improvements Project
Results
$2,000,000 to $2,200,000 est. value
Daytona Beach, FL 32100

Design/Build Services for The East Central Regional Rail Trail, Phase 4A (Guise Road to Gobbler's Lodge Road, Osteen)
Results
Osteen, FL

30th Street ADA Sidewalk Project - Pine Tree Drive to Hibiscus Drive
Results
Less than $74,545 est. value
Edgewater, FL

Sweetheart Trail - Sickler Drive
Results
Daytona Beach, FL

Rob Sullivan CDBG / ADA Parking Stalls
Results
DeBary, FL 32713

CDBG Ames Parking Improvements and Landscape Renovations
Results
Ormond Beach, FL 32173

Sidewalk Repair and Reconstruction Project
Results
DeBary, FL

Last Updated 01/29/2019 11:51 AM
Project Title

Concrete Driveway and Site Work for Lift Station #31 Project

Physical Address View project details and contacts
City, State (County) De Land, FL 32720   (Volusia County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Construct a new concrete driveway to service the existing Lift Station #31 located at 34 Old Tree Line Trail, DeLand, FL 32724. 1. Provide temporary construction entrance, add erosion control and tree barricades 2. Remove trees shown to be removed and other vegetation within the driveway footprint, provide grubbing as required and remove all material from the this operation from the project site and dispose offsite. 3. Excavate retention pond, grade and fill the site as required to establish finished grade 4. Construct retaining wall with handrail 5. Raise existing manhole to grade (approximately 3 feet), please note that the existing lift station has been raised to finished grade and the force main has been raised as needed by others 6. Construct curb, generator pad, concrete driveway and steel bollards 7. Provide Bahia sod, fencing, swing gate and landscape 8. Provide all construction layout survey and as built drawings prepared by registered Florida Surveyor.
Details
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents