Similar Projects
Reported | 01/13/2022 12:00 AM |
Project Title | CM Firms for the Development and Construction of A New, Modern Public Safety Building |
Physical Address | View project details and contacts |
City, State (County) | Somerville, MA (Middlesex County) |
Category(s) | Government/Public, Heavy and Highway |
Sub-Category(s) | Fire/Police Station, Parking Garage |
Contracting Method | Competitive Bids. Construction Management - CM at Risk. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | $51,250,000 |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | DCAMM Certificate. This project consists of the design and construction of a new four-story Public Safety Building with adjacent two-story open parking garage, for the City of Somerville. The new building will be irregularly shaped structure of approximately 74,000 sq. ft., that will house both police and fire departments. The adjacent garage will be approximately 9,000 sq. ft., and be separated from the main building with an expansion joint. The buildings will be a Risk Category IV –Essential Facility structures. The first floor will have spaces for the fire departments apparatus bays and offices; police department offices, cells, and for public assembly spaces. The second, third and fourth floors will have offices, areas for fitness and locker rooms, living quarters for the fire department, as well as spaces for mechanicals and training. The first floor will be a slab-ongrade (on improved soils). The second, third, and fourth floors will be composite slab on steel deck with structural steel beams and girders. The roof (steel roof deck supported on structural steel beams and girders) will be flat with mechanical units. Lateral loads will be resisted by structural steel braced frames and moment frames in each direction. The parking garage will be a two level open garage with a slab-on-grade first floor (on improved soils), and the upper level will be composite slab on steel deck with structural steel beams and girders. Lateral loads will be resisted by structural steel braced frames and moment frames in each direction. |
||||||||||||||||||||||||||||||||||||||||||
Details | ,, 83,000 SF - Fire/Police Station, 4 Stories Above Grade, 74,000 SF New Construction, 1 Parking Garage, 2 Stories Above Grade, 9,000 SF New Construction.
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |