Similar Projects
Bridge Street Water Main Replacement Church Street to Volunteers Green
Infrastructure
Bidding
$316,880 est. value
Richmond, VT 05477

Water System Improvements
Infrastructure
Bidding
$500,000 est. value
Jeffersonville, VT

Addison County Community Trust Otter Creek Mobile Home Park Water System Improvements
Post-Bid
Less than $200,000 est. value
Vergennes, VT

Water System Improvements
Post-Bid
Hyde Park, VT 05655

Water System South End Upgrades, Phase III, Dewey to Weeks Extension
Results
$300,000 to $350,000 est. value
Bennington, VT 05201

Dow Pond Area Waterline Replacement Project
Results
$300,000 est. value
Middlebury, VT

Ductile Iron Pipe 2021
Post-Bid
Rutland, VT

Vail Drive Transmission Main Replacement
Results
Lyndonville, VT 05452

Live Insertion Valves and Line Stops
Post-Bid
Rutland, VT

Bethel Water System Improvements
Results
Bethel, VT 05032

Milton Mobile Home Cooperative Water And Sewer Improvement Project
New Construction
Post-Bid
Less than $1,500,000 est. value
VT 05468

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Ductile Iron Pipe 2022
Term Contract
Post-Bid
Rutland, VT

Prospect Street Water Main Replacement, Contract 2020-1
Results
$900,000 est. value
Manchester, VT

Water Meters 2022
Term Contract
Post-Bid
Rutland, VT

Last Updated 07/29/2021 11:52 AM
Project Title

Silver Lake State Park Utility System Improvements

Physical Address View project details and contacts
City, State (County) Barnard, VT 05031   (Windsor County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $379,537
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of, but is not limited to: This utility improvement project will improve the existing water distribution system servicing the park and camping areas, upgrade the park’s main wastewater pump station, and replace a roadway culvert that passes the park's mainstream drainage. The project will include modifications to the existing water distribution system that sources supply from both a drilled artisan well and from the adjacent lake and will include excavation for the placement of new water distribution lines, and reconnection of water service to existing buildings & replaced water stands, old water line abandonment/removal. The existing pump station is to be retrofitted with new pumps, controls and assemblies, and will also include the placement and piping of a new concrete valve vault. This retrofit will connect with existing influent and delivery force main piping associated with the existing galvanized lines, and replace all electrical and signal lines and conduit, and all incidental work necessary to complete the project.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents