Similar Projects
NM-4 Transmission Line Replacement - Los Alamos County
Infrastructure
Conception
$6,000,000 CJ est. value
Los Alamos, NM 87544

Aspen School Area Phase 2 Sewer Line R and R - Los Alamos County
Infrastructure
Conception
$268,500 CJ est. value
Los Alamos, NM 87544

Flex Laboratory at the Research Park
New Construction, Infrastructure - 83,000 SF
Design
$23,000,000 CJ est. value
Los Alamos, NM 87544

Golf Course Site Improvements Phase One
Infrastructure
Bidding
$200,000 CJ est. value
Los Alamos, NM 87544

Water Systems Storage Tanks Design
Infrastructure
Post-Bid
Los Alamos, NM

RFQ Contractor - El Vado Dam Spillways and Dam Crest Modification Project
Infrastructure
Post-Bid
$86,000,000 CJ est. value
Tierra Amarilla, NM 87575

World-Wide Water Storage Tank Remediation
Term Contract
Results

Bayo Booster Non-Potable Water Storage Tank Construction Project - Phase I
Infrastructure
Results
Los Alamos, NM 87544

Aspen School Area Pipeline Phase 2 - Los Alamos County
Infrastructure
Conception
$831,000 CJ est. value
Los Alamos, NM 87544

33rd 34th and Arkansas Road and Utility Improvements Project
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Los Alamos, NM 87544

Sewer Lift Station and WWTP Pump Systems-Operation, Maintenance and Training Services
New Construction
Results
Los Alamos, NM

Central Avenue - 9th Street to Round-A-Bout - Los Alamos County
Infrastructure
Conception
$351,252 CJ est. value
Los Alamos, NM 87544

Effluent Tank Stabilization
Infrastructure
Post-Bid
$20,000 est. value
Los Alamos, NM

Bathtub Row/Nectar/Peach - Los Alamos County
Infrastructure
Conception
$592,643 CJ est. value
Los Alamos, NM 87544

Engineering Services for NM502/Trinity Drive Safety and ADA Improvements
Infrastructure
Post-Bid
$592,124 CJ est. value
Los Alamos, NM 87544

Last Updated 11/07/2022 01:03 PM
Project Title

Bayo Booster Station Tank Phase II - Los Alamos County

Physical Address View project details and contacts
City, State (County) Los Alamos, NM 87544   (Los Alamos County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $2,929,880 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This is Phase II of the project to construct a new 833,000-gallon non-potable water tank at the Bayo Booster Station. The majority of the piping, new metering and required demolition was completed as Phase I with funding from a Water Trust Board (WTB) loan/grant. Phase II will complete the project and expand the storage from 182,000 gallons to 1,015,000 gallons, allowing the non-potable system to capture flows normally discharged to the environment. This will increase the amount of non-potable water that can be conveyed to Los Alamos for irrigation. Project is included County of Los Alamos FY 2023 - Adopted Budgets. As of November 7, 2022, a design team has not been identified. Construction schedule is Spring and Summer 2023 *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents