Similar Projects
2020 Street, Drainage, Water and Sewer Improvements
Post-Bid
$630,000 to $730,000 est. value
Dunn, NC 28334

2021 Water Main Replacement Project
Post-Bid
Cary, NC

Wise Interchange Water and Sewer System Improvements
Results
$291,831 est. value
NC

Design Build Services for a 24-Inch Water Main Extension
Results
Less than $7,267,250 est. value
Concord, NC 28026

Water/Sewer Service Installation
New Construction - 4,111 SF
Construction
Spring Lake, NC

North Carolina DHHS Campus Phase 1 Motor Fleet Management Utilities Relocation
Infrastructure
Construction
Raleigh, NC

Reepsville Road Interconnection
Post-Bid
Lincolnton, NC 28092

Advanced Metering Infrastructure System
Results
Havelock, NC 28532

Phase 6 Water Improvements
Post-Bid
Enfield, NC 27823

2018 Water System Improvements
Results
Less than $1,013,675 est. value
Roper, NC 27970

Water and Sewer Maintenance 2021-2022
Post-Bid
High Point, NC

16" Deep Raw Water Main Upgrade - Southern Outer Banks Water System
Results
Less than $450,000 est. value
Currituck, NC 27929

Stallings Road Water Improvements 2020
Post-Bid
Monroe, NC

2020 Water Improvements Projects Contract Number 270 - Standby Power Systems
Results
Goldsboro, NC 27530

Montlieu Avenue Roadway and Utility Improvements
Post-Bid
High Point, NC 27260

Last Updated 06/27/2022 09:49 AM
Project Title

Shoal Road to Crouse Utility Connection - Lincoln County

Physical Address View project details and contacts
City, State (County) Lincolnton, NC   (Lincoln County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2025
Bids Due View project details and contacts
Estimated Value $2,750,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Lincolnton, North Carolina. Conceptual plans call for site work for a water / sewer project. Shoal Road to Crouse Utility Connection A detailed scope has not yet been determined As of June 24, 2022, this project is currently in the FY 2023-2027 CIP. Funding for this project is allotted in the couny's capital improvement plan for construction FY 2024 A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents