Similar Projects
Banner Gilbert Medical Center Parking Lots
Design
Gilbert, AZ 85234

Buckeye Pool & Parking Expansion
New Construction - 19,000 SF
Design
$1,450,000 est. value
Buckeye, AZ 85326

Citywide Meter Vault Improvements Phase IV
Bidding
$162,733 est. value
Glendale, AZ

Research on the Impact of Diamond Grind Pavement Resurfacing on PM-10 Emissions
Term Contract
Post-Bid
AZ

Wastewater Collection System Rehabilitation
Post-Bid
Guadalupe, AZ

Pinnacle Peak Road 45th Avenue to 35th Avenue Paving and Storm Drain Improvements
Results
$9,000,722 est. value
Glendale, AZ 85310

Phoenix-Casa Grande Highway (I-10) 1-17 (Split) to SR 202L (Santan)
Results
Chandler, AZ 85225

5290 East Exeter Subdivision
New Construction
Construction
Phoenix, AZ 85018

Bungalows on Westgate - Glendale
New Construction, Infrastructure
Construction
Glendale, AZ 85305

Festival Ranch Planning Area 2 Kerry Lane Infrastructure Water Line and Offsite Water Line
Post-Bid
Buckeye, AZ

Lehi Crossing Shared Use Pathway - Phase 1
Results
Mesa, AZ

Heritage Acres
New Construction - 203,030 SF
Construction
$600,000 est. value
Queen Creek, AZ 85142

Festival Ranch Planning Area 2 Infrastructure Effluent Line
Post-Bid
Sun City, AZ

Professional Services for Loop 101 and Loop 202 Freeway Waterline and Sewer Rehabilitation
Results
Chandler, AZ 85225

Fiesta Village Street - Onsite Improvement Plan
Renovation
Construction
$250,000 est. value
Mesa, AZ 85210

Last Updated 07/25/2022 10:12 AM
Project Title

MC85 at 95th Avenue to 87th Avenue

Physical Address View project details and contacts
City, State (County) Tolleson, AZ 85353   (Maricopa County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of removal and replacement of asphalt pavement, roadway widening, curb and gutter installation, traffic signal installation, utility valve and manhole adjustments, sidewalk placement, lime/cement subrade stabilization, microsurfacing, pipe removal and installation, scupper installation, signing and marking and SRP Irrigation and lighting adjustments. No pre-bid conference is scheduled. Contract duration: 485 days Q & A deadline: Aug 09, 2022 5:00:00 PM EDT

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents