Similar Projects
Glenwood St, Goddard Rd / US 20/26 (Chinden Blvd) - Ada County Highway District
Infrastructure
Conception
$762,000 est. value
Boise, ID

Maple Grove Road and Edna Street Pedestrian Crossing - Ada County Highway District
Infrastructure
Conception
$245,000 est. value
Boise, ID 83704

Lewiston Regional Office Facility Improvements - Phase II
New Construction, Infrastructure, Renovation
Design
$1,000,000 CJ est. value
Boise, ID 83702

Lewiston Regional Office Facility Improvements - Phase II
New Construction, Infrastructure, Renovation
Design
$1,000,000 CJ est. value
Boise, ID 83702

Star Road Bridge #1093
Demolition, New Construction, Infrastructure
Bidding
$294,000 CJ est. value
Star, ID 83669

Star Road Bridge #1093
Demolition, New Construction, Infrastructure
Bidding
$294,000 CJ est. value
Star, ID 83669

RFQ D/B - Student Residence Hall
New Construction, Infrastructure
Post-Bid
$4,181,379 CJ est. value
Boise, ID 83706

Prime Earth Pit Reclamation
Infrastructure
Post-Bid
Eagle, ID 83616

Bull Meadow Sage-Grouse Habitat Improvement
Infrastructure
Results
$400,000 est. value
Boise, ID

North 25th Street Extension
Infrastructure
Results
$30,000 est. value
Boise, ID 83702

Project Peregrine - FaceBook / Meta Data Center / Kuna
New Construction, Infrastructure - 960,000 SF
Construction
$800,000,000 CJ est. value
Kuna, ID 83634

Project Peregrine - FaceBook / Meta Data Center / Kuna
New Construction, Infrastructure - 960,000 SF
Construction
$800,000,000 CJ est. value
Kuna, ID 83634

ICCU Downtown Tower
New Construction, Infrastructure
Pending Verification
$73,000,000 CJ est. value
Boise, ID 83702

ICCU Downtown Tower
New Construction, Infrastructure
Pending Verification
$73,000,000 CJ est. value
Boise, ID 83702

RFP Design - Design Plans for Pickles Butte Sanitary Landfill Gas Collection Project
Alteration
Conception
Boise, ID

Last Updated 01/08/2024 10:19 AM
Project Title

Orchard Street and Franklin Road Accessible Pedestrian Signal

Physical Address View project details and contacts
City, State (County) Boise, ID 83705   (Ada County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $748,743 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of January 8, 2024, project was awarded to Capital Paving, awarded amount is $749,742.50.** Replacing existing traffic signal and installing of Accessible Pedestrian Signal (APS), pedestrian ramps, sidewalk, and landscape repairs across all four legs of the intersection. In compliance with the Americans with Disability Act (ADA) The work shall be completed in its entirety on or before August 14, 2024. The completion dates are predicated on the intent of ACHD to issue a Notice to Proceed to the Contractor on or about March 25, 2024. ACHD shall be entitled to Liquidated Damages of $1,000.00 for each calendar day of delay in the completion of the work. A delay on one portion of the project does not justify delays on other portions of the project. All questions or clarifications concerning the content and requirements of the Invitation to Bid (ITB) must be posted in the Q&A section of the solicitation located at the eProcurement Portal. All questions or clarifications must be submitted by 12:00 pm on Monday, December 18, 2023. Any interpretation that may alter or change the ITB will be in writing, in the form of Addenda, which will be furnished via the eProcurement Portal. It is the Bidder's responsibility to check for Addenda before submitting bids. The right is reserved to reject all proposals or reject any proposal not conforming to the intent and purpose of the Contract Documents whenever such action appears to be in the best interest of ACHD. Award of a contract pursuant to this invitation may be delayed, without penalty, for up to sixty (60) calendar days after the date of bid Proposals must be accompanied by a photocopy or electronic version, e.g. PDF, FAX,etc. of certified check, cashier's check, or a bid bond (collectively referred to hereafter as "Bid Security") issued by a surety authorized to issue such bonds in the State of Idaho, in the amount of ten percent (10%) of the total amount of the proposal submitted. If a photocopy or electronic version of a certified check, or cashier's check is provided with the proposal, an original certified check or cashier's check shall be submitted to ACHD within 48 hours of the bid opening. The ACHD reserves the right to reject all bids, including the apparent low bid, when these bids are in excess of ten percent (10%) over the Engineer's Estimate. Replacing existing traffic signal and installing of Accessible Pedestrian Signal (APS), pedestrian ramps, sidewalk, and landscape repairs across all four legs of the intersection. In compliance with the Americans with Disability Act (ADA).

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents