Similar Projects
Hilton Garden Inn
New Construction - 116,100 SF
Design
$50,000,000 est. value
Camden, NJ 08104

Haddonfield Road - Townhomes Phase II
New Construction
Design
Pennsauken, NJ 08109

Site Improvements at Montgomery Upper Middle School
Post-Bid
Montgomery Township, NJ

Micro-Pile Sub-Contractors
Post-Bid
$1,700,000 est. value
Trenton, NJ

Delco Lead Storage and Inspection Facility and County Yards
Results
New Brunswick, NJ 08901

Development of Bader Field
Results
Atlantic City, NJ

Freedom Village
New Construction
Construction
$18,000,000 to $19,000,000 est. value
West Windsor, NJ 08540

Funeral Home
New Construction, Demolition - 11,441 SF
Construction
$580,000 est. value
Mount Laurel, NJ 08054

Parking Improvements
Renovation
Pending Verification
Ocean, NJ 07712

Parking Lot Expansion
New Construction
Pending Verification
Freehold, NJ 08501

Korean Community Center of Greater Princeton
New Construction - 7,875 SF
Design
West Windsor, NJ 08550

Underpinning and Permeation Grouting
Post-Bid
$7,900,000 est. value
Trenton, NJ

2018 Historic Site Construction
Results
Madison, NJ

Cornerstone at Howell
New Construction
Construction
$22,600,000 est. value
Howell, NJ 07731

Dunkin Donuts with Drive Thru
New Construction, Demolition - 2,017 SF
Design
$500,000 to $1,000,000 CJ est. value
Winslow, NJ 08009

Last Updated 10/23/2019 10:44 AM
Project Title

Sideslope Closure Construction at the Middlesex County Landfill

Physical Address View project details and contacts
City, State (County) East Brunswick, NJ 08871   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description construction of the Sideslope Closure and Appurtenances and associated site improvements at the Middlesex County Landfill, in a manner that will not interrupt the existing landfill operations. The work includes but is not limited to the following: 1. Establishing Contractor's staging area, field offices for Contractor and Engineer, posting signage, establishing construction traffic routes. 2. Survey Controls and intermediate verifications. 3. Site clearing, grubbing, stripping and subgrade preparation as required to install the new final cap section. 4. Performance of a preconstruction survey utilizing ground shots on a 50 foot grid pattern referenced to the NJ Plane Coordinate System. 5. Placement and compaction of approximately 60,000 cubic yards of embankment fill, provided by MCUA, intended to serve as levelling course for the construction of the final cap. 6. Performance of a subgrade survey following placement of levelling course fill utilizing ground shots on a 50 foot grid pattern referenced to the NJ Plane Coordinate System for review and evaluation by the Engineer. 7. Installation of soil erosion and sediment control measures, including inlet protection and temporary silt fence, as required. 8. Construction of all contact water conveyance systems, including excavation, piping, placement of bedding stone or embankment fill as specified, backfilling and all fittings, end sections, cleanouts, stone and filter fabric, as required on landfill slopes and with the retrofitted rip-rap channels. 9. Construction of all stormwater conveyance systems, including precast post-tensioned concrete culverts, grassed and rip-rap swales, excavation, placement of bedding stone, rip-rap and embankment fill as specified, backfilling and all fittings, sections, stone, filter fabric, topsoil, seeding and erosion control matting. 10. Placement and compaction of approved embankment fills for the construction of the new final cap section, roadway grade changes, culvert support and backfill and all new liner foundations. 11. Placement of the new final cap system including textured synthetic liner, double-faced geocomposite drain with filter fabric, installing anchor trenches, tying into existing anchor trenches and welding new liner to existing liner at landfill cell perimeters, drainage sand, geotextile separation layer and vegetative cover, seeding and erosion control matting. 12. Improvements to Ramp 1, including grading, compaction, placement of additional DGA roadstone, removal and replacement with additional guiderail, removal of existing culvert, new sideslope rip-rap channel, and all associated work. 13. Compliance with all aspects of MCUA Quality Assurance and Quality Control Plan including providing all Construction Quality Control (CQC) testing of all earthwork and the entire liner system, and the preparation of submittals, lift maps and final as-built survey required for NJDEP acceptance of the installed cap system. 14. Topsoil placement, grading, seeding and erosion control matting. 15. Protection of all work, restoration of all work areas and cleanup, as required.
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents