Similar Projects
2022 Bond - Proposition A - Corrigan-Camden Independent School District
Renovation, Infrastructure
Conception
$21,490,700 CJ est. value
Corrigan, TX 75939

Corrigan Truck Stop Uday #11 / Corrigan
New Construction, Infrastructure - 6,129 SF
Design
$3,000,000 CJ est. value
Corrigan, TX 75939

John Deere / Livingston
New Construction, Infrastructure - 38,100 SF
Design
$5,000,000 CJ est. value
Livingston, TX 77351

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Site Modernization and Dwelling Unit Remodel
Renovation, Infrastructure
Post-Bid
Livingston, TX

Double Layer Of Chip & Seal
Alteration
Post-Bid
Onalaska, TX

Polk County Glo Dr 2017 Program County Roadway Improvement
Results
$310,000 est. value
Livingston, TX

San Marcos Aquatic Resources Center - Rehabilitation and Realignment of The Entrance Road
Term Contract
Results
$1,000,000 to $5,000,000 est. value
San Marcos, TX 78666

US 59 - Highway Improvement
Infrastructure
Construction
$172,799,108 CJ est. value
Livingston, TX 77351

US 59 - Highway Improvement
Infrastructure
Construction
$172,799,108 CJ est. value
Livingston, TX 77351

Livingston Assisted Living / Livingston
New Construction, Infrastructure - 9,613 SF
Pending Verification
$2,100,000 CJ est. value
Livingston, TX 77351

US 190 Improvements to serve the Alabama-Coushatta Tribe of Texas
Infrastructure
Bidding
$1,958,000 CJ est. value
Livingston, TX 77351

Lagoon Ranch RV Resort
Infrastructure, Alteration
Post-Bid
$5,300,000 est. value
Onalaska, TX 77360

Construction of the 2020 Street Improvements
Infrastructure
Results
$196,000 est. value
Onalaska, TX

Last Updated 03/05/2023 11:39 PM
Project Title

US 59 Bypass and US 287 Water / Sewer Relocation Services

Physical Address View project details and contacts
City, State (County) Corrigan, TX 75939   (Polk County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $452,766 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Base Bid A: Approximately 720 LF 2 waterline & associated work on Poncho Road. As shown on Plans. Base Bid B: Approximately 2,844 LF of 8 waterline & associated work, approximately 3,286 LF of 2 sewer force main & associated work, and installation of 2 manholes on an existing 8 sewer line. This portion of the Project is associated with relocation work alongside and crossing US 287 and the proposed route of the US 59 Bypass corridor. As shown on Plans. The CONTRACT DOCUMENTS may be examined at the following locations: OWNER: City of Corrigan 101 W. Ben Franklin Corrigan, Texas 75939 (936) 398-4126 ENGINEER : Goodwin-Lasiter-Strong 1609 S. Chestnut, Suite 202 Lufkin, Texas 75901 (936) 637-4900

Details

Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents