Similar Projects
Coworking Facility Renovation
Renovation - 12,500 SF
Design
$1,100,000 est. value
Morgantown, WV 26505

Stair Renovations for Davis Hall Bridge Valley Community and Technical College
Renovation - 8,288 SF
Bidding
$2,000,000 est. value
Montgomery, WV 25136

Financing, Development and Construction of a Baseball Stadium
New Construction
Bidding
$1,150,000 est. value
Huntington, WV 25701

Puskar Center Silver Lot Improvements
Post-Bid
Morgantown, WV 26505

Vet Tech Relocation
Renovation, Addition - 6,646 SF
Post-Bid
Clarksburg, WV

Radiography Lab
New Construction
Results
Wheeling, WV

Engineering Science Building G85 Maker Space
Renovation
Results
Morgantown, WV

School Of Dentistry, Construction Manager At Risk
New Construction
Post-Bid
Morgantown, WV

MCA South- Renovations Tech Center and Maclin Hall
Renovation
Results
Montgomery, WV 25136

Patio Expansion
Addition
Post-Bid
Martinsburg, WV 25403

Bid Package No 1 Hangar 13 Envelope Renovations - Marshall University
Renovation
Results
Huntington, WV 25755

WVUP - Main Campus Building Renovation
Renovation - 4,200 SF
Post-Bid
Parkersburg, WV

HSC Immunology Lab Renovation
Renovation - 2,720 SF
Results
Morgantown, WV

Einstein Bros - Bagels Project
New Construction
Post-Bid
Morgantown, WV 26505

Hal Greer Memorial Plaza
New Construction
Results
Huntington, WV

Reported 07/13/2022 12:00 AM
Project Title

Marshall University Biotech - ARF-Cart-Rack Washer Addition

Physical Address View project details and contacts
City, State (County) Huntington, WV 25703   (Cabell County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $52,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work includes the installation of a new Cart Rack Washer for the Marshall University Biotech Building to provide additional capacity/redundancy along with the existing washer currently installed. This work will require removing existing equipment and field modifying existing stainless steel equipment panels to allow for the installation of the new washer. A new recessed pit shall also be provided for installation of the new cart washer. All associated MEP connections to the cart washer are to be taken from nearby existing systems to allow for full system functionality as shown on the floor plans.

Details

College/University, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents