Similar Projects
Construction of Harrington Trails Phase I WWTP Site Work and Wet Well
Post-Bid
TX

Bar Screen and Grating Replacement
Post-Bid
$2,751,000 est. value
Houston, TX 77251

Pine Gully Wastewater Treatment Plant - Phase 1A
Results
$3,000,000 to $3,200,000 est. value
Seabrook, TX 77586

Contract 1 - Intake and Water Treatment Plant
Results
Less than $7,032,561 est. value
Mart, TX 76664

Berry Creek Highlands - Phase I
Post-Bid
Georgetown, TX 78746

Wastewater Treatment Plant Phase 1
Results
Less than $2,139,671 est. value
TX

Wastewater Treatment Plant Clarifier No. 1
Post-Bid
TX

Hearne 2018 CDBG WWTP Improvements
Results
Less than $200,000 est. value
TX

Construction of Wastewater Treatment Plant for Big Sky Estates Phase 1
Post-Bid
Less than $1,000,000 est. value
Denton, TX 76201

Waste Water Treatment Plant Surge Capacity Pond
Results
Hemphill, TX 75948

Bayview Mud WWTF Blowers Replacement
Post-Bid
Bacliff, TX 77518

Waste Water Plant Maintenance and Repair
Results
Less than $50,000 est. value
Von Ormy, TX 78073

Waste Water Treatment Plant Mitigation
Post-Bid
Orange, TX 77630

Salitrillo Wastewater Treatment Plant Progressive Design Build Upgrades
Results
Less than $25,000,000 est. value
San Antonio, TX 78204

City of Los Fresnos Wastewater Headworks and Chlorine Contact Chamber Project
Post-Bid
Los Fresnos, TX 78523

Last Updated 08/18/2021 03:30 PM
Project Title

Wastewater Treatment Plant Phase II

Physical Address View project details and contacts
City, State (County) Houston, TX   (Brazoria County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Sewage Treatment Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents