Similar Projects
Venture Academy High School Improvements
Renovation
Conception
Minneapolis, MN 55414

Venture Academy Middle School
Build-Out
Conception
Minneapolis, MN

Park Center Senior High Locker Room Renovations
Build-out, Renovation
Bidding
$200,000 CJ est. value
Minneapolis, MN 55443

Best Value Contractor for the North High School Renovations
Renovation
Post-Bid
Minneapolis, MN 55411

Armstrong High School 2022 LTFM
Renovation
Post-Bid
Minneapolis, MN 55441

Momentum Addition to Pagel Activity Center
Addition - 10,000 SF
Results
Minnetonka, MN 55345

Bethune Arts Magnet Renovations and Performance Addition Project
Renovation, Addition
Results
Minneapolis, MN 55411

Justice Page Middle School Addition and Renovation
Renovation, Addition
Construction
Minneapolis, MN 55419

Minnetonka High School - New Vantage / Momentum Building
New Construction, Infrastructure - 36,300 SF
Construction
$15,555,083 CJ est. value
Minnetonka, MN 55345

2022 Andersen Middle School Phase 2
Renovation
Post-Bid
Minneapolis, MN 55407

Lake Harriet Upper Entrance
Renovation
Results
Minneapolis, MN 55410

Elizabeth Hall Observatory Renovations
Renovation
Post-Bid
Minneapolis, MN 55411

Plymouth Middle School 2022 LTFM
Renovation
Results
Minneapolis, MN 55441

Anthony Safe and Welcoming Entry and Miscellaneous Upgrades
Renovation, Alteration
Post-Bid
Minneapolis, MN 55419

Robbinsdale Middle School 2022 LTFM
Renovation
Results
Robbinsdale, MN 55422

Last Updated 03/23/2023 03:16 PM
Project Title

Rebid Trade Pack 1A - Saint Louis Park High School Classroom Renovations - Phase I

Physical Address View project details and contacts
City, State (County) St Louis Park, MN 55426   (Hennepin County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

For Saint Louis Park High School Classroom Renovations - Phase I Phase I of the project consists of renovations to thirty (30) classrooms and the adjacent circulation spaces in the high school building. Direct questions regarding this project to the office of the construction manager: Knutson Construction 7515 Wayzata Boulevard Minneapolis, Minnesota 55426 Main Office: 763-546-1400

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents