Similar Projects
Intersection Safety Improvements - US 15/SC 61
Infrastructure
Bidding
$2,000,000 CJ est. value
Walterboro, SC 29488

Intersection Safety Improvements - US 15/SC 61
Infrastructure
Bidding
$2,000,000 CJ est. value
Walterboro, SC 29488

Asphalt Repair and Concrete Addition
Post-Bid
$17,000 est. value
Sumter, SC 29153

Manning Road Fire Station Driveway Replacement
Post-Bid
Sumter, SC 29150

Preservation - Sumter Co
Infrastructure
Results
SC

ADA Ramp at Shaw Height Elementary
Alteration
Results
$77,875 est. value
Shaw Air Force Base, Sumter, SC 29152

US 15 Highway Funeral Home
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Sumter, SC 29150

Raceway #1531- The Retreat / Sumter
New Construction, Infrastructure - 3,705 SF
Bidding
$1,300,000 CJ est. value
Sumter, SC 29150

State Street Resurfacing FY 21/22
Infrastructure
Post-Bid
Sumter, SC

Safety Improvements - US 76 (Sumter)
Infrastructure
Results
SC

City Road Resurfacing 2022
Infrastructure
Bidding
$1,000,000 CJ est. value
Sumter, SC 29150

City Street Resurfacing FY 21/22
Infrastructure
Post-Bid
Sumter, SC

Reconstruction of County Roads - 2021
Infrastructure
Results
Sumter, SC

State Road Resurfacing 2022
Infrastructure
Bidding
$1,000,000 CJ est. value
Sumter, SC 29150

Downtown Property Development
Infrastructure
Post-Bid
Sumter, SC 29150

Last Updated 08/10/2022 03:38 PM
Project Title

Carter Road Self-Storage

Physical Address View project details and contacts
City, State (County) Sumter, SC 29150   (Sumter County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The major site plan was presented to the Sumter Planning commission July 2022. Information regarding architect or contractor has yet to be determined. Although a firm timeline has yet to be announced, construction is estimated to begin fourth quarter 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

,, 43,048 SF - Parking Space/Stalls, 4 Parking Spaces. 576 SF. 42,472 SF Cells, 330 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents