Similar Projects
Repair/Maintain Airfield Stormwater System Phs II, FGWB 04-0014P2A and FGWB 04-0014P2B
Design
$5,000,000 to $10,000,000 est. value
Marietta, GA

Storm Drain Lining
Infrastructure
Bidding
Fairburn, GA

Stormwater Detention Ponds Remediation
Infrastructure
Bidding
Grovetown, GA

Road and Stormwater Maintenance and Repair Services
Term Contract
Post-Bid
Dunwoody, GA 30338

CDBG - Kennesaw Heights Subdivision
Post-Bid
Kennesaw, GA 30144

Water, Waste Water, and Storm Water Run-Off Usage at The Gillem Enclave
Results
Forest Park, GA 30297

Stormwater Pipe Repair Using Chemical Liners (Multiyear Contract)
Results
GA

ADA and Other Improvements
Infrastructure, Alteration
Bidding
Atlanta, GA

Right of Way Improvements
Post-Bid
Thomaston, GA 30286

On-Call Storm Pipe Cleaning
Term Contract
Results
Less than $75,000 est. value
Alpharetta, GA 30009

William Street Storm Drainage Improvements Project
Infrastructure
Bidding
Dacula, GA 30211

Dewater Quarry
Post-Bid
Auburn, GA 30011

MS4 Stormwater Inventory Inspections
Term Contract
Results
Alpharetta, GA 30009

Improvements to Existing Stromwater System - Kimball Street
Infrastructure
Bidding
Winder, GA

Harrington Lane Storm Drain Replacement Project
Post-Bid
Lawrenceville, GA 30046

Last Updated 08/13/2021 08:24 AM
Project Title

340 Cottonpatch Drive Storm Drain Replacement Project

Physical Address View project details and contacts
City, State (County) Lawrenceville, GA   (Gwinnett County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed by the General Contractor consist of but is not limited to the following major items: Demolition and removal of existing storm drain pipe system including street cuts, all concrete structures, curb & gutter, trees, shrubs, etc. as shown in plans. Install complete new 24” RCP in street crossing, 2 catch basins & 24” HDPE and tie-in to existing structures, new including stone bedding and backfill up to spring elevation with # 57 stone, 24” Headwall, with Rip Rap. Installation of sod/landscaping, backfill, mulch including erosion control to match existing. Cleanup including re-grout of all structures and asphalt street patching.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents